WTC Visual Survey Form t00 t Z $ I
Premise Address: 1'
(O L. LIAPA ST.
Block:
Lot: 9p
3 I Residential
tMbcUseDOtherrl
Commercial jJ I Name of Building:
# of Stories: I AKA's: I I5
Building Owner/Management: Telephone Number ( )
Name: FAX•
Address: ..
On Site Contact:
Name: Telephone Number X Z.
Building Owner Management Activities
Interior Survey Performed ❑ Yes ❑ No
Exterior Survey Performed ❑ Yes ❑ No
General Clean Up 0 Yes ❑ No Locations:
ACM Clean Up ❑ Yes ❑ No Locations:
Air Monitoring 0 Yes ❑ No Locations:
Copies of All Reports and Data Requested Yes
Visual Insi*ctlon Results:
Facade:
Inspected Debris
North ❑ N/A ❑Yes ❑ No 0 No Visible/Fine Layer ❑%to 1" 0>10
South ❑ N/A ❑ Yes ❑ No ❑ No Visible/Fine Layer ❑%to1" 0>10
East ❑ N/A ❑Yes ❑ No ❑ No Visible/Fine Layer ❑Yto1" ❑>1"
West ❑N/A ❑Yes❑No ❑ No Visible/Fine Layer ❑%to1" 0>1"
Facade Description:
Roof
Debris: to 1" 0>1"
Description:
Setbacks N/A ❑
Floor Debris: ❑ No Visible/Fine Layer ❑ 34 to 1" 0>10
Floor Debris: ❑ No Visible/Fine Layer ❑ % to 1" ❑ > 1"
Floor. Debris: ❑ No Visible/Fine Layer ❑ i4 to 1" 0>1"
Floor„_ Debris: ❑ No Visible/Fine Layer ❑ % to 1" 0>1"
Floor Debris: ❑ No Visible/Fine Layer ❑ Ya to 1" 0>10
DEP inspection form for documenting facade condition assessment and potential asbestos-containing materials at building following World Trade Center disaster.
9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993