Memo regarding 125 Greenwich Street follow-up, Sep 2002

Machine-extracted title · confidence 100%

Letter dated September 25, 2002, following up on a conversation regarding work at 125 Greenwich Street.

NYC-WTC_000108246–000108250

Folder label: “120 LIBERTY STREET; 1001040, 52/21

Page image
Scanned page image, NYC-WTC_000108246
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sep 25 02 04:01p p.2

Fiber Control Inc. 3010 Bums Aveme wamso, NY 11793-3296 Te1:(516)'81.3U00 Faa:(t6)781-3U85 NNN'.LH'(i~T I.C.T

September 25, 2002

New York City Dept of Environmental Protection Asbestos Control Program 59-17 Junction Boulevard Corona, NY 11368-5107 Att: Penny Theodorellys-Perez, Deputy Director

Re: 125 Cedar Street

Dear Penny, 9-22-02, I am taking this opportunity to follow-up on our recent conversation. This past Sunday,discussed the myself, Tony, Ralph, and Adam met to review our site safety plan and procedures. We following items: job site • Worker decontamination and proper usage of showers and personal hygiene as it relates to this • Negative air filtration and job site electric problems • Waste bag out procedures • Job site security

and workers As of Monday, 9-23-02, a meeting was held with foremen, supervisors, shop stewards, to emphasize the importance of the following: and that non-ccmplianee will lead to dismissal of • It is expected that all employees follow worker decontamination protocols not orgy the workers but the supervisors as well • No worker will leave prior to proper usage of showers and decon facilities on site operation • ensure proper AN negative air fi ltration units will be checked on a per shift basis tosupervisor, If a power problem exists, it will, be brought to the attention of the who wilt then take action to ensure • sufficient power to allow continuous operation of filtration units • That waste bags must pass through the bag-out for double Lagging prior to disposal supervisor • That job site security, specifically lc down is the responsibility of the shift

smoothly. We have ample At this time we have no injuries to workers and the work is moving along supervision, staff, equipment and materials to accomplish the tasks assigned in a safe and compliant manner.

any further I appreciate your concern, support, and confidence in our services. Should you need information or assistance, please do not hesitate to call.

• ely,

r braride PROJECT MANAGER A4 PG:ls

NYC-WTC 000108246

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000108246Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →