Exterior Debris Survey Notice, 120 Liberty Street, May 2002

Machine-extracted title · confidence 90%

Notice regarding exterior building surveys and debris removal at 120 Liberty Street following WTC collapse.

NYC-WTC_000107427–000107432
Page image
Scanned page image, NYC-WTC_000107429
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ENVIRONMENTAL PROTECTION I , , NYC DEPARTMENT OF /~` ov~h ~ Asbestos Control Program 411 NY 11368-5107 d—Zi%g—"tJ 59-r +ebbn Boulevard. 80 Floor. Corona. Building Dept. or TRU No FOR OFFMIA USE ONLY

ASBESTOS PROJECT NOTIFICATION E (ASBESTOS INSPECTION REPORT) 1. FO ..... a.ee.~aeo (See schedule)

Department of Buildings, the original form and three (3) copies with original When submitting this form at the NYC NYCDEP requires one copy of the form with original signatures. This signatures are required. Submittal at the start of abatement actMties . not less than one week in advance of the form must be submitted to the NYC DEP

I. FACILITY Borough ManhattanZip 11201 2. Address 125 Cedar 3. Block 52 4. Lot 21 AKA Residential 6. Name of Building 5. Type of Facility II. BUILDING OWNER Joe Me s s i no 8. Contact Person 7. Name 120 Liberty L.L.C. 718-830-0 131 Fax# 9.Tel.# 97-77 Queens Blvd. City Flushing State NY Zip 11374 10. Address

Ill. GENERAL CONTRACTOR Tel. # 11. Name CONTRACTOR IV. ASBESTOS ABATEMENT Peter Grande Inc. 13. Contact Person 12. Name Fiber Control Pill 15. Tel. # 51 6-781 -3000 Fax# 51 6-781 -3085 14. Federal Employer ID. # ----- -------------- NY Zp 11793 Wantagh State 16. Address 301 0 Burns Avenue City

V. THIRD PARTY AIR MONITOR Burkhardt 18.ContactPerson Fred A.T.C. Associates 17. Name 212-353-8306 ------------ 212-353-8280 Fax PII 20. Tel # 19. Federal Employer ID. # New Yor k State NY Zip 10010 04 East 25th Street City 21. Address 1 Associates 23. NYS DOH ELAP # 1 0 8 7 9 22. Sample Analysis Laboratory T•C

VI. PROJECT INFORMATION / Z _ Projected completion date fb 7 /ate 24. Starting date for this portion of work Wednesday ® Thursday [ Friday I Saturday- . Sunday Asbestos work schedule Y ® Tuesday ® 13 Monday ~-~ oa ~ Shift from: ® am 0 pm to

If other, \` specify the work schedule indicated in this item. Access to inspect the premises must be provided during

25. Total amount of asbestos-containing material to be abated during this work C)? 1 ~i

—9• _0 Linear Feet ood Square Feet, and/or ACP 7 22001

NYC-WTC 000107429

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107429Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →