NYC 9111 Public Portal Document
HVAC INSPECTION/OBSERVATIONS
An inspection was conducted of the mechanical equipment room and associated CARRIER
50BTOR60 HVAC unit located on the 33rd floor. This unit serves the entire floor. The
following was noted:
Mechanical Equipment Room:
• The mechanical equipment room was well lit, unpainted, and clean.
• There was a shovel, crates and cardboard stored in the room.
• The mechanical equipment room is used as a mixing plenum.
• The pipes were not labeled or color-coded.
Air Mixing Chamber:
• The doors closed tightly.
• The outside air intake was located at least 25 feet from any apparent source of contaminants
and was protected by a bird screen.
• Damper positions for outside air were open at minimum settings.
• Return air dampers were open at maximum settings.
• The filter bank was famed and contained 15% - 25% efficiency, box-type filters which were
in good condition and are replaced approximately every two months.
Coil Chamber:
• The coils were clean and well maintained.
• Condensate drip pans (CDPs) were clean, and there were no odors or signs of standing water,
condensate, and leaks.
Project 220490
NYC-WTC 000105576
OCR can misread numbers and units. Confirm readings against the page image before using them.