POST PROJECT REPORT
PROJECT NAME: Syms Department Store
Trinity Place
New York. NY
PROJECT REPRESENTAT1VE:
Ken Qoold, Mgr.
Synns
Mac Edwards, ASCS
Duct Cleats —Project Mgr
JOB DATES: 9/22!01,10/23101 &.10/24/01
SUMMARY OF WORK:
first, second, third, f ath and fifth
The interior surfaces of the hvac systems servicing the removal, "Envirocc ",'vas
source
floors at Syrras were cleaned. On completion of
applied for control of bacteria. All work was performed in accordance wit NADCA
heating, Ventilatin & Air
General Specifications for the Cleaning of Commercial
inspected on completion of rork. The
Conditioning Systems. All areas were visually unoccupied during the i
cleanwg was performed at right and all areas were
dust, especially heavy, i the return air
All the ventilation systems contained a buildup of
fiberglass-lined sheet metal• 21e build up
ducts. AU of the ducts were constructed with
the age of the systems and previo
in the ducts was to be expected based on with no sign ofd
maintenance. The fiberglass liner was in good condition
corrosion, mold or mildew. r evidence of
There was no visible evidence of dampness,
insects or of rodents was discovered.
were installed in the air ducts d all surfaces
During the cleaning process, access panels All debris collected w4s placed in
were contact cleaned with heap filtration vacuums.
dumpster.
3mi1 poly bags and placed in owner designated
Continue to document quarto filter
IAQ PROGRAM RECOMMENDATIONS: 5 years.
changes. Inspert'Reclean all systems again in