114 Liberty Street March 17, 2003
Floor Zip Borough Block Lot Squad # Badge #
All 10006 1 (Manhattan) 52 7502 N/A A019
Inspector Building Type Basis of Inspection Photos Taken
Penny Theodorell s Y A TRU0273MN03 No
Contractor's Name Sample Number
ETS Construction, Inc 030317/A019001 through 030317/A019015
Address City Sample Number
160 Clay Street, Brooklyn
State Zip Phone Sample Number
NY 11222 (718) 706-6300
Laboratory Name Owner's Name
JLC Environmental Consultants 114 Liberty LLC
Address City Address City
200 Park Avenue South, New York
State Zip Phone State Zip Phone
NY 10003 (212)420-8119
Contact Person Time of Inspection from:
1:30 P.M. — 4:15 P.M.
This inspection was the continued monitoring of the DEP clean-up activities at the site. All work to be
performed in accordance with contracts WTC-LBC and WTC-LBA. Clarifications and updates were
provided to the contractors and residents by e-mail. Copies of correspondence to be incorporated with
these inspection reports.
Mr. Bob Middleton of ETS was on site. He indicated he expected to meet all project deadlines and he
stated he would be submitting a new work schedule.
I entered the work area with the project monitor, the site supervisors, and Mr. Rammohan.
Work progress was in accordance with the scope of work.
Samples were collected of the surfacing material (fireproofing) from the 4th (001-005), 7th (006-010), and
9th (011-015) floors. Samples were collected from areas with existing damage. In-place pipe insulation
was observed on the 7th and 9th floors. The insulation was intact and was suspect ACM and was not
sampled.
Analytical results reported orally by the laboratory indicated the samples were negative. Written report
pending.