Asbestos removal invoice, 80 Maiden Lane, Dec 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp detailing roof cleanup costs for 80 Maiden Lane dated December 31, 2002.

NYC-WTC_000102343–000102357

Folder label: “80 MAIDEN LANE

Page image
Scanned page image, NYC-WTC_000102344
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

iBB NC IT PROTECTION s~ "~a ocf / ~r " ' Asbestos Control Program 59-17 Junction Boulevard, 8th Floor, Corona, NY 11368-5107 1 I co U Building Dept or N< fwi FOR OFFICIAL USE ONLY N ASBESTOS PROJECT NOTIFICATION WILL BE (ASBESTOS INSPECTION REPORT) CEP TED www.nvc. ov(de 1. schedule)

When submitting this form at the NYC Departrnent of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

1. FACILITY

2. Address —4 0 H4/b AJ L^/. Borough. 11AV1*41r4dZip

AKA -!3 - °2-7 e 6bd'e $r — 3. Block 4. Lot 5. Type of Facility. 6. Name of Building II. BUILDING OWNER

7. Name,~T 'E An// i- 8. Contact Person C.0A16,Ar7A1E-

9. Tel. # .2/2. 34 T!?' L Fax # # 10. Address City State __ - Zip Ill. GENERAL CONTRACTOR

11. Name Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name V~ ,o AS$ S70s REMoVf1L Cot?P. 13. Contact Person 5y PARH(6r/ 1Vf 14. Federal Employer ID. # PIA _._._._._._._._. 15. Tel. # "?!& '76I y!o v - Fax # _7! 8 ?6! <(!O

16. Address J`/' L0 /2 9 _ ST --__-_-- City é°c c ~~ Pr ±LL Zip _ /(3 state ±L1 — V. THIRD PARTY AIR MONITOR

17. Name _&l AMW ~- PAZ. E'2 M& • OC . 18. Contact Person 19. Federal Employer ID. # 20. Tel. # 217- 9 L 2 0 a 77 —_ Fax #

21. Address _ 2-Z? r- 4 Y4/S $r. — _ City N `1 State ..LL Zip _ /9f 7

22. Sample Analysis Laboratory ' ✓mgxo 4- # '2g' F'NG P C. . 23. NYS DOH ELAP # _23. VI. PROJECT INFORMATION 24. Starting date for this portion of work st 1q 0 2 Projected completion date

Asbestos work schedule I9 Monday ® Tuesday I3 Wednesday Thursday I9 Friday 13 Saturday I9 Sunday

Shift from: ~'" IZam ❑ pm to 8-"'' ❑ am IZ pm If other, specify --- ' /` AECEIVED Access to inspect the premises must be provided during the work schedule indicated in this Item. NO 25. Total amount of asbestos-containing material to be abated during this work

0 Square Feet, and/or 0 Linear Feet of=f

j 2/2001

NYC-WTC 000102344

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102344Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →