Invoice for facade remediation, 10-12 Cortland St, July 2002

Machine-extracted title · confidence 95%

Invoice from Fiber Control Inc. detailing facade remediation work at 10-12 Cortland Street.

NYC-WTC_000100303–000100313

Folder label: “51 MURRAY ST 1001438, 133/10

Page image
Scanned page image, NYC-WTC_000100304
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

J09 (i>1 DAP q. NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION ' Asbestos Control Program 59-17 Junction Boulevard, 8°iFloor, Corona, NY 11368.5107 r1voc12, ONL1 ASBESTOS. PROJECT NOTIFICATION W (ASBESTOS INSPECTION REPORT) i _U tee schedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original ' signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

I. FACILITY

2. Address 5 l M. U &A ( 9'T Borough zip 400 AKA - 3. Block _ 4. Lot

5. Type of Facility 6. Name of Building It. BUILDING OWNER

7. Name __6 1 a i i T E-h CO iU 8. Contact Person _ fG.YYt Qk La 9. Tel. #( R In lD ~- Fax# 01.1) 607— L/((&, 10. Address City NJ 7 State __ _ 2fp o7.....

III. GENERAL CONTRACTOR /

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name _J / E'e G ) .6 !t 13. Contact Person ~~7~ (::::3/,9

14. Federal Employer ID. # PH j 15. Tel. # ~1 G - 7~I~`300 0 Fax #_____________

1) 16. Address _~~ ~ S ~ City J f! State N Zip _117

V. THIRD PARTY MONITOR At 17. Name bk A~ J *M ZE Q.. t ~S, f C 18. Contact Person Ytt L 4. (0L

19. Federal Employer ID. # 20. Tel.# ara-gas-Goj Fax#2t3 992-06 O 21. Address . g 1Kt i1tç S (✓ E ( City ,_t ' 3 w- tC T— State ~ Zip 00 ( / 22. Sample Analysis Laboratory C(~c l (Ft'L h> Z (~`K'f£Sr ~ ct 23. NYS DOH EtAP # _(f s -C .

VI. PROJECT INFORMATION 24_Starting date for this portion of work (4/21/02 Projected completion date 7 l5 C2—

Asbestos work schedule ❑ Monday ❑ Tuesday ❑ Wednesday ❑ Thursday 0 Friday ❑•Saturday ❑ Sunday

Shift from: ❑ am 0 pm to 0 am 0 pm

If other, specify pr,4 CP l\LI+CtY~O Access to Inspect the premises must be provided during the work schedule Indicated In this Item. M `u N 1 8 i o .J t to 25. Total amount of asbestos-containing material to be abated during this work =3rESTOS/LEA_ CA /41/ L D Square Feet. and/or Unear Feet P TRUGM O~. 2 ACP 7 tt!n r et•::+rriyt~ t 212001

m„;

NYC-WTC 000100304

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100304Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →