Folder label: “32 PARK PLACE Block: 126 Lot: 2 Soe 7 BIN: 1001410 110 Church Street, 50 Murray Street

Page image
Scanned page image, NYC-WTC_000098630
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I The Property Damage Insurance shall specifically cover any damages suffered by the Owner and Consultant, as well as the public in general.

3. AUTOMOBILE AND TRUCK INSURANCE: In an amount not less than ten million ($10,000,000.00) for injuries and or wrongful death to any one person and subject to the same limit for each person, in an amount not less I than ten million dollars ($10,000,000.00) on account of one accident and Property Damage Insurance in an amount not less than two hundred fifty thousand dollars ($250,000.00). I 4. COMPREHENSIVE GENERAL LIABILITY: The Contractor shall

I provide such insurance as Premises Operations (including incidental contracts), Completed Operations/Products and Blanket Contractual ($10,000,000.00) ten million dollars. I 32. CASH ALLOWANCES:

a) The Drawings and Specifications indicate the standard of quality of materials and work required. The Contractor shall verify dimensions and conditions at the site prior to submitting his bid to determine exact quantities of labor and materials I and adjustments to details and conditions necessary to complete the purpose and intention of the project.

b) All labor and materials reasonably inferred by the specifications shall be completed by the Contractor for the fixed price stated in his bid. No CASH

I 33. ALLOWANCES shall be accepted for any item of labor, material or equipment.

ASSIGNMENT OF THE CONTRACT:

I The Contractor shall not assign or transfer the contract, or transfer in whole or in part any rights or privileges which may accrue under the terms of the contract, or to assign any I money which may become due under the contract, without the written consent of the Owner.

I 34. TEMPORARY SERVICES:

The Contractor may utilize water and electricity at the project site which shall be made available by the Owner from existing connection points. The Contractor shall be respon- sible for distribution of services to work areas on the project site, in accordance with prevailing codes and local requirements. Temporary services shall be maintained by the I Contractor and shall be secured at the end of each work day.

L u

n SC-8

NYC-WTC 000098630

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098630Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →