NYC-WTC_000097101
NYC Department of Environmental Protection
WTC Unoccupied Building Monitoring Program
125 Cedar Street
Project #WTC-UNA
Item No.
Description of Item
Unit
Quantity
Unit Price
Cost
—_
Project Monitor
Hour
560
Air Monitoring Technician
Hour
560
Wipe Sampling Technician
Hour
300
Me, PCM, TEM Analysis
Sample
180
M Analysis
Sample
105
lead Wipe Sample Analysis
Sample
144
PAHs Wipe Sampe Analysis
Sample
144
Dioxin Wipe Sample Analysis
Sample
144
N [SO [ww 1D | O lm | Cj}; Oo
Fibrous Glass Sample Analysis
Sample
120
rystalline Silica Sample Analysis
Sample
25
oO\=-
Te
Mercury Sample Analysis
Sample
144
Total Cost (Sum of items 1
through 11)
The cost of each item must include the preparation, quality assurance and control, clean-up,
storage & shipping of samples etc., normally associated with the sampling, visual inspection
and producing
the reports requested.
NYC 9/11 Public Portal Document
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000097101Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
A laboratory report detailing costs and quantities for various environmental analyses including air monitoring and lead wipe samples at 125 Cedar Street.