Action Item I Notables
Unit No.
• Built-in air conditioning unit to be evaluated by the project monitor to determine proper
cleaning or disposal methods.
• The wood burning stove is to be cleaned by wet wiping and HEPA vacuuming. Compressed dry
air (low pressure) shall be used to blow debris/dust from openings/crevices. HEPA vacuuming
Penthouse
must be preformed in conjunction with this procedure. The chimney shall be cleaned to the
exhaust point.
• The wooden chest is bolted in place; it can be unbolted for cleaning.
• Wooden decking shall be cleaned after consultation with tenant.
12SE • Wall-mounted carpeting shall be cleaned in accordance with the carpet procedures specified
herein.
• Interior of chimney flue leading to the roof shall be cleaned.
11 S • Living room walls shall not be wet wiped.
• Bureau shall be cleaned after consultation with tenant.
• Painting behind bed shall not be handled.
• The crawlspace located in the bathroom shall be cleaned. If demolition is required to access
this crawlspace, the contractor shall provide the demolition. The contractor is not responsible
l OS for floor replacement.
• An isolation barrier shall be installed over the closet with boxes. Boxes shall not be handled or
cleaned.
8N • North column wall to be removed.
• Stored moldin s shall be cleaned after consultation with tenant.
• The jukebox shall be cleaned. Compressed dry air (low pressure) shall be used to blow
7N debris/dust from openings/crevices in these items. HEPA vacuuming must be preformed in
conjunction with this procedure._Care must be taken not to damage the items.
7S • The re bricks shall be he a vacuumed
• The piano shall be cleaned. Compressed dry air (low pressure) shall be used to blow
debris/dust from openings/crevices. HEPA vacuuming must be preformed in conjunction with
5N this procedure. Care must be taken not to damage the piano. This procedure shall be repeated
until the piano is appropriately clean as determined by the project monitor.
• Radiator covers shall be removed and discarded.
• Knitting machines shall be cleaned. Yarn on the machine shall be disposed. Compressed dry
air (low pressure) shall be used to blow debris/dust from openings/crevices. HEPA vacuuming
must be preformed in conjunction with this procedure. Care must be taken not to damage the
3N machines. This procedure shall be repeated until the machines are appropriately clean as
determined by the project monitor.
• Artwork shall be cleaned after consultation with tenant.
• Slides shall be cleaned after consultation with tenant.
3S • The painting shall be covered without cleaning it.
5 of 6
NYC-WTC 000096704
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000096704Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Document discussing public concerns regarding the allocation of $500 million in grants between large corporations and small businesses during post-9/11 recovery.