Health and safety plan Part II, 30 Warren Street, January

Machine-extracted title · confidence 100%

Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.

NYC-WTC_000096623–000096675

Folder label: “201 WARREN STREET Block: 16 Lot: 220

Page image
Scanned page image, NYC-WTC_000096628
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part 111 —Health & Safety Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 —January 10, 2006

EMERGENCY PLAN

Building Evacuation

In the event evacuation of the building is required on an emergency basis, the following shall be incorporated to the extent possible. All personnel working in the potentially impacted areas shall be given the opportunity to read this section of the Health and Safety Plan (HASP). The remainder of the attached HASP will be implemented as conditions allow.

A. PROTECT WORKERS POTENTIALLY EXPOSED TO BUILDING CONTAMINANTS 1. Notify workers that levels of asbestos and additional contaminants above background levels may be present in building dust, contents, and building components. 2. Avoid ingesting dust. 3. Avoid inhaling dust. 4. Minimize contact with the dust, contents and building components to the extent possible. 5. Wear protective coveralls or disposable coveralls to facilitate cleanup of workers.

B. AVOID SPREAD OF CONTAMINATION 1. Limit activities that promote transport of dust 2. Do not remove equipment which has been in contact with potential contamination until it has been checked and released.

C. MINIMIZE POTENTIAL PUBLIC CONTACT Limit access using barricades, temporary fencing, "jersey barriers." Control, to the extent possible, off-site tracking by vehicles, potentially contaminated boots or clothing by workers.

D. DISPOSAL 1. Any removed materials should be disposed of as required by law.

E. NOTIFY AUTHORITIES 1. Notify Agencies identified on the enclosed emergency notification list (Page 5)

Designated Assembly Area: In the event of an evacuation the designated assembly point for site personnel is: Northeast Corner of World Trade Center Site — West side of Church Street North of New Subway Entrance.

Reporting Emergencies: All site personnel, upon discovering an emergency situation, shall immediately call 911. The Contractor Safety Officer (CSO) shall be notified immediately thereafter and will assume responsibility as the onsite representative to thT First Responders. The CSO shall immediately notify OWNER.

Note; Any explosion, regardless of size or type, any structural failure,fires and certain powerfailures will require a complete building evacuation.

NYC-WTC 000096628

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000096628Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →