Permit application Part III, health Jan 2006

Machine-extracted title · confidence 90%

Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.

NYC-WTC_000095781–000095833

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095809
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part III — Health & Safety Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January 10, 2006

6.0 COMMUNICATIONS

6.1 GENERAL COMMUNICATIONS

The Field Team Leader will have available at the Site the means for telephone communications, or an equivalent means of communication, for summoning emergency assistance from the fire/ambulance and police departments in the event they are required. The telephone will also act as a direct link to technical personnel for information pertaining to all phases of the project.

6.2 RADIOTELEPHONES

Short-range walkie-talkies or cellular telephones will be made available to designated personnel working at the Site.

6.3 EMERGENCY WARNING

In the event of an emergency condition, the Field Team Leader will notify project personnel verbally if all are within immediate hearing and via a bullhorn if the Site area is large. The Field Team Leader will also notify visitors present within the area. Site personnel will immediately proceed to a pre-designated assembly area as designated by the Field Team Leader during the daily safety meeting. Personnel will remain in the designated area until further instructions are received by the Field Team Leader.

All communication equipment will be tested at the beginning of each day to verify operational integrity.

6.4 HAND SIGNALS

Hand signals will be used by field teams in conjunction with the buddy system. Hand signals shall be familiar to the entire field team before operations commence and should be reviewed during site- specific training.

Signal Meaning

Hand gripping throat Out of air; can't breathe Grip partner's wrist Leave area immediately; no debate Hands on top of head Need assistance Thumbs up OK; I'm all right; I understand Thumbs down No; negative

6.5 SITE SECURITY

The following site control measures shall be implemented to protect the public and personnel working on-site.

• Fences, guardrails and access devices, including ladders, stairways, and walking surfaces shall be provided and maintained throughout the project activities in accordance with 29 CFR 1926.

29

NYC-WTC 000095809

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095809Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →