NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/44 WALL STREET Block: 43 Lot: 1
Document / 91 pages

Invoice for asbestos sample analysis, 44 Wall Street

Machine-extracted title · confidence 100%

Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.

NYC-WTC_000094912–000095002

Folder label: “44 WALL STREET Block: 43 Lot: 1

Page image
Scanned page image, NYC-WTC_000094914
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Cushman & Wakefield,Inc.

44 Wall Street Action Plan World Trade Center Disaster

September 15, 2001— Hillman Environmental Group in to perform testing of Lobby area. No power in the building. September 18, 2001- Notified all tenants to have their a/c units cleaned and filters changed prior to start-up. September 18, 2001— Concept Air in to pressure wash coils and change filters on 5th floor fans. September 19, 2001— Concept Air in to pressure wash coils and change filters on 3'd floor fans and a/c#8 fan. September 19, 2001— Degmor Asbestos & Lead Abatement in vacuumed and wet wiped 24th floor Elevator Room and Penthouse Space. September 20, 2001— Concept Air in to pressure wash coils and change filters on a/c #7-1 and a/c#7-2 fans. September 20, 2001— Degmor in vacuumed all elevator pits and soffits around the lobby. September 21, 2001— Degmor in vacuumed and wet wiped lobby area and inside elevator cars. September 21, 2001— Hillman Environmental Group performed further testing throughout the building. September 22, 2001— Notified of slightly elevated reading in the unoccupied penthouse space. Sealed area and notified tenant area would re-cleaned 9/22/01. Degmor in to re-clean Penthouse and also 24th, 16th and 7"' floor elevator rooms. cleaned September 24, 2001— Concept Air in to pressure wash coils and change filters on 3rd floor fan. September 25, 2001— Concept Air in to pressure wash coils and change filters on A & B level fans. October 1 & 2,2001 - Degmor removed 600sq ft of water damaged VAT on the "B" Level. CTSI performed Asbestos Project Monitoring. October 4, 2001--------Hillman Re-tested all levels well within guidelines. October 26,2001 -----Benjamin Maintenance performed Facade Cleaning. November 9, 2001

NYC-WTC 000094914

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094914Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000150335 · Box DEP Box 11

Review draft of an environmental health and safety plan for debris operations at Staten Island Landfill.

Cited alongside this record in an Ask answer

Compare copies and versions →