NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/200 VESEY STREET Block: 16 Lot: 140
Document / 14 pages

Asbestos assessment report, 3 World Financial Center, Apr 2002

Machine-extracted title · confidence 90%

Asbestos assessment report for 3 World Financial Center prepared by EMG, Inc. dated April 18, 2002.

NYC-WTC_000094856–000094869

Folder label: “200 VESEY STREET Block: 16 Lot: 140

Page image
Scanned page image, NYC-WTC_000094866
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PRIVILEGED and CONFIDENTIAL Prepared at the Request of Counsel

NUMBER OF DATE OF FINAL NUMBER OF DATE OF DATE OF INITIAL CLEARANCE CLEARANCE CLEARANCE CLEARANCE BACKGROUND NUMBER OF SAMPLE SAMPLES BACKGROUND SAMPLE SAMPLES SAMPLE 1ST SE COLLECTION (2ND SE COLLECTION SAMPLES COLLECTION FLOOR 3/20/2002 91N 2/2/2002 12 IN /12 OUT 2/11/2002 9 IN /9 OUT 16 2/3/2002 12 IN 112 OUT 3/22/2002 91N /9 OUT 3/27/2002 9 IN 15 /12 3/19/2002 OUT 3/22/2002 9 IN 14 2/3/2002 12 IN / 12 OUT 3/20/2002 9 IN /9 OUT 3/26/2002 12 IN 12 2/5/2002 9 IN / 5 OUT 3/12/2002 9 IN /9 OUT 3/26/2002 /9 OUT 3/29/2002 9 IN 11 9 IN 12 3/16/2002 OUT 3/21/2002 12 IN 10 3/8/2002 12 IN / 12 OUT 12 12 2/22/2002 OUT 2/28/2002 12 9 2/13/2002 12 IN / 12 OUT 12 N N12 121N/12 2/26/2002 OUT 3/3/2002 OUT 8 2/18/2002 12 IN / 12 OUT 121N/12 2/2812002 OUT 3/6/2002 12 IN 7 2/18/2002 12 IN / 12 OUT 12 I 12 3/4/2002 OI UT 3/10/2002 12 IN 6 2124/2002 12 IN / 12 OUT 12 N / 12 3/9/2002 OUT 3/14/2002 12 IN 5 2/28/2002 12 IN / 12 OUT 12 12 3/14/2002 OUT 3/19/2002 12 IN 4 3/5/2002 12 IN / 12 OUT 3rd floor - Training N/A N/A room 12/20/2001 5 IN /5 OUT 12/28/2001 5 IN /5 OUT 3rd floor — 3 IN / 3 OUT N/A N/A AC2C 12/26/2001 3 IN / 3 OUT 12/28/2001 2nd floor and 2"' floor 12/13/01, N/A N/A mezzanine 12/14/01 16 12/22/2001 5 IN / 5 OUT

1st floor - Southeast N/A N/A comer 1/2/2002 5 IN / 5 OUT 1/4/2001 5 IN / 5 OUT

The As shown in the table above, two air clearance sample collections were conducted. initial clearance was collected following the thorough cleaning of the floor space, and following the encapsulation of the original, non-asbestos spray-on fireproofing on decks and columns floor. The second set, the final clearance samples, were collected following the cleaning of the Heating, Ventilation, and Air Conditioning (HVAC) interior duct systems on each floor.

A "negative" exposure was also determined during this portion of the cleanup, as compared to the OSHA 8-hour TWA PEL of 0.1 fibers per cubic centimeter (f/cc).

9 April 18, 2002

NYC-WTC 000094866

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094866Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →