222 Rector Street
Machine-extracted address · confidence 0.15 · verify source page
Activity by month
| Month | Pages |
|---|---|
| Feb 2003 | 2 |
Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
No test candidates in this selection.
Documents for this building
2 documents across 2 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Chain of custody · 1
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
132 pages · 2003-02-19 · Environmental Protection, Dept. of · Box DEP Box 10 · folder “EPA Indoor Air Cleanup” · matched page 1Form · 1
Plan outlining cleaning timelines, cancellation policies, HVAC inspection deadlines, and access agreement requirements for February 2003.
7 pages · 2003-02-19 · Environmental Protection, Dept. of · Box DEP Box 42 · matched page 3Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.