111 Fulton Street
Machine-extracted address · confidence 0.55 · verify source page
Building details
Present-day data · provided by prospect.nyc. These figures describe the lot today, not in 2001 — building facts only, never owner names, unit lists or sales.
Activity by month
| Month | Pages |
|---|---|
| Jul 2002 | 21 |
| Aug 2002 | 1 |
Tests over time
Each dot is a day on which a test candidate page names that substance for this building; bigger dots mean more pages that day. Dates and substances are machine-extracted from the page, and a dot is a page, not a result.
Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
| Date / source | Page candidates |
|---|---|
| Asbestos TEM analysis, ATC 8508, 7/15/02 2002-07-15 NYC-WTC_000345007 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Airborne asbestos TEM, NYC DEP, 2002 2002-07-16 NYC-WTC_000345023 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Asbestos TEM report, 228 E 45th St, 2002 2002-07-17 NYC-WTC_000345027 · p. 1 ↗ | asbestos, chrysotile Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| TEM asbestos report, 228 E 45th St, 2002 2002-07-18 · 2002-07-19 NYC-WTC_000345031 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| TEM analysis report header, 8543 project 2002-07-19 NYC-WTC_000345012 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Asbestos TEM analysis, 228 E 45th St, 2002 2002-07-20 NYC-WTC_000345016 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Asbestos fiber analysis report, 111 Fulton Street, July 2002 2002-07-24 NYC-WTC_000128736 · p. 1 ↗ | asbestos Values found on the page: 96% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Asbestos fiber analysis results, NYC DEP, July 2002 2002-07-24 NYC-WTC_000206075 · p. 1 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.55 (how sure the index is that this page concerns this building) · verify |
| Invoice from Benjamin Kurzban & Son Control Inc., 111 Fulton Date not extracted NYC-WTC_000128703 · p. 4 ↗ | asbestos Values found on the page: 95% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.40 (how sure the index is that this page concerns this building) · verify |
Documents for this building
22 documents across 2 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Lab report · 6
TEM analysis results attached; AHERA methodology for abatement clearance.
1 page · 2002-07-15 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis results for NYC DEP samples at 228 E 45th Street, 2002.
1 page · 2002-07-16 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis results for NYC DEP air samples; 7/2002, AHERA compliance.
1 page · 2002-07-17 · Environmental Protection, Dept. of · Box — · matched page 1TEM air sample results for NYC DEP project, following AHERA method for clearance of abatement sites.
1 page · 2002-07-18 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis results of air samples for NYC DEP, AHERA-compliant clearance at a New York site, 2002.
1 page · 2002-07-20 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis report for roof & facades; NYC DEP project associated with W&P at 228 East 45th Street.
1 page · 2002-07-25 – 2002-07-30 · Environmental Protection, Dept. of · Box — · matched page 1Memo or letter · 2
TEM analysis report of air samples for asbestos; NYC DEP project documentation.
1 page · 2002-07-19 · Environmental Protection, Dept. of · Box — · matched page 1TEM TEM report for air samples; AHERA method; NYC DEP project, 2002.
1 page · 2002-07-24 · Environmental Protection, Dept. of · Box — · matched page 1Invoice · 1
Invoice for environmental services at 111 Fulton Street with no visible date in excerpt.
27 pages · 2002-07-25 – 2002-07-31 · Environmental Protection, Dept. of · Box DEP Box 52 · folder “111 FULTON STREET 1001263, 91/1” · test candidate pages · matched page 1Unclassified · 13
ATC TEM asbestos analysis results for NYC DEP project, 7/15/02.
1 page · 2002-07-15 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1Airborne asbestos analysis by TEM for NYC DEP project; AHERA method.
1 page · 2002-07-16 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1Asbestos TEM analysis results for NYC DEP project; AHERA method, 2002.
1 page · 2002-07-17 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1TEM asbestos analysis results for NYC DEP; AHERA methodology, 2002.
1 page · 2002-07-18 – 2002-07-19 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1TEM asbestos analysis by ATC for NYC DEP W&P, July 2002.
1 page · 2002-07-19 · Environmental Protection, Dept. of · Box — · matched page 1TEM asbestos analysis report for NYC DEP project; ATC 8543.
1 page · 2002-07-19 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1Asbestos fiber analysis by TEM performed on air samples for NYC DEP, AHERA method, 2002.
1 page · 2002-07-20 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1Laboratory report from ATC Associates dated July 24, 2002, detailing asbestos fiber analysis for 111 Fulton Street.
3 pages · 2002-07-24 · Environmental Protection, Dept. of · Box DEP Box 52 · folder “111 FULTON STREET 1001263, 91/1” · test candidate pages · matched page 1Summary of transmission electron microscopy results showing asbestos fiber concentrations and analytical notes for specific samples.
1 page · 2002-07-24 · Environmental Protection, Dept. of · Box — · test candidate pages · matched page 1TEM asbestos analysis log with client and project details, 7/24/02.
1 page · 2002-07-24 · Environmental Protection, Dept. of · Box — · matched page 1Airborne asbestos TEM report; NYC DEP project; lab ID T02-07-014; 07/25/02.
1 page · 2002-07-24 – 2002-07-25 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis results for airborne asbestos; client Warren & [name], P.C.; NYC DEP project at Fulton Street.
1 page · 2002-07-25 · Environmental Protection, Dept. of · Box — · matched page 1TEM analysis results for airborne asbestos; client Warren & [name], P.C.; NYC DEP project at Fulton Street.
1 page · 2002-08-02 · Environmental Protection, Dept. of · Box — · matched page 1Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.