NYC-WTC_000152439
Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.
Environmental Protection, Dept. of · Box DEP Box 26
machine-extracted · confidence 1.00 · Check page ↗Vice President · Organization not recorded
machine-extracted · confidence 1.00 · Check page ↗1999-11-09 – 2001-11-26
machine-extracted · confidence unavailable · Check page ↗This person appears because of their official role on the records linked below. Appearance implies nothing about anyone. Actions describe the signature or routing block on a record.
Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
ConEdison letter re: water pumping operation, September 2001 · page 1machine-extracted · confidence unavailable · Check page ↗
NYSDEC letter re: Con-Edison release report at 7 WTC substation, · page 4machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000152439
Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.
Environmental Protection, Dept. of · Box DEP Box 26
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000165927
State agency review of Con-Edison's plan detailing the release of transformer oil and cable dielectric fluid at the World Trade Center site.
Design and Construction, Dept. of · Box 7DDC
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this official's signature pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0006.
ConEdison letter re: water pumping operation, September 2001 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYSDEC letter re: Con-Edison release report at 7 WTC substation, · page 4machine-extracted · confidence 1.00 · Check page ↗