NYC-WTC_000302406
Night preliminary daily workforce and equipment at World Trade Center site, January 8, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗Official signatory · Organization not recorded
machine-extracted · confidence 1.00 · Check page ↗2002-01-29 – 2002-01-29
machine-extracted · confidence unavailable · Check page ↗This person appears because of their official role on the records linked below. Appearance implies nothing about anyone. Actions describe the signature or routing block on a record.
Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
Daily work force report, World Trade Center, Jan 8, 2002 · page 1machine-extracted · confidence unavailable · Check page ↗
Daily work force report, Grace Contracting, WTC · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000302406
Night preliminary daily workforce and equipment at World Trade Center site, January 8, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000407412
Daily workforce counts and equipment listed for World Trade construction site.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this official's signature pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0009.
Daily work force report, World Trade Center, Jan 8, 2002 · page 1machine-extracted · confidence 1.00 · Check page ↗
Daily work force report, Grace Contracting, WTC · page 1machine-extracted · confidence 1.00 · Check page ↗