E-mails 2003 M. Gilsenan — page 4
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Summary Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Summary Forwarding of WTC background study documents including building access and sampling fact sheets to agency recipients.
EPA will analyze each of the samples collected for asbestos and lead.
Summary Forwarding of WTC background study materials and building access fact sheets to DEP staff.
EPA will analyze each of the samples collected for asbestos and lead.
EPA will analyze each of the samples collected for asbestos and lead.
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
MONITORING Each Subcontractor and trade employer shall perform personnel air sampling for the following contaminants during Abatement Phase of the project: particulates as TSP, metals as TSP, asbestos
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
MONITORING Each Subcontractor and trade employer shall perform personnel air sampling for the following contaminants during Abatement Phase of the project: particulates as TSP, metals as TSP, asbestos
Summary EPA circulates WTC background study documents and sampling fact sheets to inter-agency partners.
Costs for the background study are being paid by the federal government EPA will analyze each of the samples collected for asbestos and lead.
Asbestos Benzene Fibrous Glass PCBs Refractory Ceramic Fibers Chromium
the professional opinion of ATC that all cleaning at 125 Cedar Street, New York, New York was conducted in accordance with the project manual as well as all applicable federal, state and local asbestos
Summary Laboratory data table listing analytical results for various dioxin and dibenzofuran compounds with detection limits.
the professional opinion of ATC that all cleaning at 125 Cedar Street, New York, New York was conducted in accordance with the project manual as well as all applicable federal, state and local asbestos
Summary A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
PCM Equivalent for asbestos only, fibers >5 n that meet the length and width ratio 2) The laboratory shall scan analytical data using a high speed scanner to enable the transfer of data electronically
Summary A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
PCM Equivalent for asbestos only, fibers >5 um that meet the length and width ratio 2) The laboratory shall scan analytical data using a high speed scanner to enable the transfer of data electronically
Summary Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
the professional opinion of ATC that all cleaning at 125 Cedar Street, New York, New York was conducted in accordance with the project manual as well as all applicable federal, state and local asbestos
EPA will analyze each of the samples collected for asbestos and lead.
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.