Building inspection form for 14 Wall Street — page 3
Summary Inspection report documenting facade debris and ACM cleanup activities at 14 Wall Street.
Avaltroni Deputy Commissioner including asbestos.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Inspection report documenting facade debris and ACM cleanup activities at 14 Wall Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Letter from property owners confirming HVAC filter changes and roof cleaning at 111 Nassau Street to comply with DEP notices.
Avaltroni y Cotinrntsstoner including asbestos.
Summary Letter from building engineer confirming ongoing cleaning and testing for asbestos at 33 Maiden Lane since September 11, 2001.
Avaitront including asbestos.
Summary Fax cover sheet from QES&T submitting a proposed work scope and TEM air sample reports to the DEP for 56 Nassau Street in September 2001.
With the exception of the one sample identified above, PtLM analysis of bulk samples did not identify asbestos above the 1% threshold for classification as ACM.
Avaltroni Deputy Commissioner including asbestos.
Summary Inspection report documenting roof and facade conditions including debris and ACM cleanup at 55 Wall Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Inspection form recording facade condition and asbestos monitoring status for 60 Wall Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Inspection form recording facade condition and asbestos monitoring status for 63 Wall Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Form documenting visual inspection results for facades and setbacks at 31 Park Row following the World Trade Center attacks.
Avaltroni Deputy Commissioner including asbestos.
Summary Letter from the Department of Environmental Protection requesting copies of contamination and cleanup reports.
Avaltroni Deputy Commissioner including asbestos.
Summary Form recording facade and interior inspections for asbestos cleanup and air monitoring at a mixed-use building.
Aver " ni " assessment of building contamination for possible hazardous components, Deputy Com toner including asbestos.
Summary Inspection checklist recording building details and facade conditions for 116 Nassau Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Solicitation document inviting bids for an emergency contract regarding environmental cleanup at lower Manhattan sites.
Avaltroni including asbestos. .
Summary Form documenting facade and debris inspection results for a building at 88 Nassau Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Form documenting facade and roof inspections for visible debris at 127 Fulton Street.
Avaltronl assessment of building contamination for possible hazardous components, Deputy Commissioner" ` including asbestos.
Summary DEP form recording inspection results for WTC debris on the north, south, east, and west facades of a building at 100 Dutch Street.
Avaltroni Deputy Commissioner including asbestos.
Summary Consultant letter confirming visual review and bulk sample collection of dust at 106 Fulton Street.
The steps included the - agsessment of building contamination for possible hazardous somponénts | Sabet ava a ibeluding asbestos. : eee ac cagtanee Today. a visual survey of. yout building's exteriors was conducted aya Tel
Summary Letter dated February 20, 2002 from property owners at 122 Fulton Street detailing HVAC maintenance and cleaning efforts.
Avaltroni Cr>ymltaloner including asbestos.
Summary Form documenting building details and facade condition assessments at 101 Maiden Lane.
Avaltroni Deputy Commissioner including asbestos.
Summary Letter from Colliers ABR confirming no further action required for dust accumulation on the roof and setbacks of 101 Maiden Lane.
P.E Director "~~ '" Asbestos