DEP-EPA asbestos sampling scope coordination, July 2002 — page 1
Summary Correspondence coordinating asbestos sampling validation and scope requirements for common spaces between DEP and EPA.
No matching passage to preview on this page.
Email alerts are not offered yet — copy this link to check back after a new release.
Browsing all mirrored pages. Enter a keyword, address or Bates number to narrow this.
Summary Correspondence coordinating asbestos sampling validation and scope requirements for common spaces between DEP and EPA.
No matching passage to preview on this page.
Summary Memo transmitting debris survey documentation with attachment for WTC cleanup tracking.
No matching passage to preview on this page.
Summary Forwarded memo discussing resolution of 43 post-hearing complaints regarding asbestos, with status on inspections and outreach to building owners.
No matching passage to preview on this page.
Summary Technical discussion comparing TEM analysis results showing over 1% asbestos versus PLM analysis showing Non-Detect for the same building unit.
No matching passage to preview on this page.
Summary Technical discussion comparing TEM analysis results showing over 1% asbestos versus PLM analysis showing Non-Detect for the same building unit.
No matching passage to preview on this page.
Summary Technical discussion comparing TEM analysis results showing over 1% asbestos versus PLM analysis showing Non-Detect for the same building unit.
No matching passage to preview on this page.
Summary DEP inter-agency memo requesting clarification on FEMA conversations regarding potential reimbursement for additional environmental risk insurance costs.
No matching passage to preview on this page.
Summary Notes from an EPA/DHHS/DOL monthly conference call on August 12, 2002 regarding WTC cleanup efforts, including EPA monitoring, cleaning effectiveness studies, and building…
No matching passage to preview on this page.
Summary Forwarding EPA sampling recommendations for incorporation into scope of work for 125 Cedar and 114 Liberty buildings.
No matching passage to preview on this page.
Summary Attorney-client communication requesting documentation of EPA recommendations regarding professional asbestos cleaning in interior spaces.
No matching passage to preview on this page.
Summary Internal correspondence discussing a bulk test result exceeding 1% in an apartment, denied access by property management, and resolution options.
No matching passage to preview on this page.
Summary Internal correspondence discussing a bulk test result exceeding 1% in an apartment, denied access by property management, and resolution options.
No matching passage to preview on this page.
Summary Internal correspondence discussing a bulk test result exceeding 1% in an apartment, denied access by property management, and resolution options.
No matching passage to preview on this page.
Summary Memo detailing complaints received, inspection phases of buildings in Lower Manhattan, and status of facade and exterior structure inspections near World Trade Center.
No matching passage to preview on this page.
Summary Inquiry regarding asbestos monitoring contract end date, scope at school sites versus broader locations, and potential changes to monitoring efforts.
No matching passage to preview on this page.
Summary Internal correspondence discussing proposed changes to exterior cleanup specifications and protocols for request for proposals.
No matching passage to preview on this page.
Summary DEP internal memo discussing exemptions from drought restrictions for WTC-related facade cleanup work using wet soaking and power washing.
No matching passage to preview on this page.
Summary DEP internal memo discussing exemptions from drought restrictions for WTC-related facade cleanup work using wet soaking and power washing.
No matching passage to preview on this page.
Summary DEP internal communication about failed reinspection attempts at an unoccupied apartment in Building 11 and proposed revisions to documentation notes.
No matching passage to preview on this page.
Summary DEP internal communication about failed reinspection attempts at an unoccupied apartment in Building 11 and proposed revisions to documentation notes.
No matching passage to preview on this page.