DEP Hard Copies (68 Boxes) / DEP Box 45 / 1 BEEKMAN STREET 34 PARK ROW BIN 1001254, 90/13
NYC-WTC_000115437Machine-extracted title FormSummary Inspection form documenting facade and roof conditions, including ACM presence and air monitoring results for a building at 34 Park Row.
Avaitrorti
Deputy Commissioner including asbestos.
• Bureau of
Environmental Compliance Today, a visual survey of your building's exterior was conducted as a
Tel (718) 595.4418
DEP Hard Copies (68 Boxes) / DEP Box 45 / 23 PARK ROW Block: 90 Lot: 7 BIN: 1001250 5 Theater Alley
NYC-WTC_000115514Machine-extracted title FormSummary Form documenting visual inspection results for facades and setbacks at 23 Park Row following the World Trade Center attacks.
Avaltroni
Deputy Commissioner including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 23 PARK ROW Block: 90 Lot: 7 BIN: 1001250 5 Theater Alley
NYC-WTC_000115519Machine-extracted title FormSummary Form documenting visual inspection results for facades and setbacks at 23 Park Row following the World Trade Center attacks.
They may be faxed to (718) 595-3744 or
sent to the NYC DEP Asbestos Control Program at 59-17 Junction Boulevard, 8th
floor, Corona, New York 11373-5108
DEP Hard Copies (68 Boxes) / DEP Box 45 / 29 PARK ROW 1001251, 90/10
NYC-WTC_000115584Machine-extracted title Memo or letterSummary Letter from a hardware group to the DEP regarding the timing of exterior building cleaning and insurance claims.
Avaltroni
Deputy Commissioner including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 29 PARK ROW 1001251, 90/10
NYC-WTC_000115587Machine-extracted title Memo or letterSummary Letter from a hardware group to the DEP regarding the timing of exterior building cleaning and insurance claims.
Avaitroni
Deputy Commissioner including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 29 PARK ROW 1001251, 90/10
NYC-WTC_000115589Machine-extracted title Memo or letterSummary Letter from a hardware group to the DEP regarding the timing of exterior building cleaning and insurance claims.
pEP HELP
Asbestos Control Program
NYC-WTC 000115589
DEP Hard Copies (68 Boxes) / DEP Box 45 / 33 PARK ROW Block: 90 Lot: 12 BIN: 1001253
NYC-WTC_000115639Machine-extracted title FormSummary Letter from NYC DEP requesting copies of environmental hazard assessments and cleanup reports for 33 Park Row.
Avaltroni
Deputy Commissioner including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 1 PARK ROW 1085949, 90/1
NYC-WTC_000115765Machine-extracted title FormSummary Inspection form recording visual results for facades and setbacks at a building in the WTC area.
Avaitroni
Deputy Commissioner including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 105 READE STREET Block: 145 Lot: 18 BIN: 1001588 AKA's: 107 Reade St
NYC-WTC_000114597Machine-extracted title Permit applicationSummary Agreement between NYC DEP and landowner to remove foreign material from exterior areas of 105 Reade Street.
ASBESTOS ABATEMENT CONTRACTOR
12. Name .J A ?ie /'C0 _,_____13. Contact Person /c?
DEP Hard Copies (68 Boxes) / DEP Box 45 / 43 PARK PLACE 1001411, 126/8
NYC-WTC_000115907Machine-extracted title Memo or letterSummary Department of Environmental Protection letter notifying building owners of visible World Trade Center debris on exterior surfaces at 43 Park Place.
The work would be
performed by NYSDOL licensed asbestos contractors with DEP and NYSDOL
certified workers.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 109 READE STREET Block: 145 Lot: 7503 BIN: 1077809 AKA's:
NYC-WTC_000114660Machine-extracted title UnclassifiedSummary Laboratory report from ATC Associates dated July 1, 2002 detailing asbestos fiber analysis results for 109 Reade Street.
Analysis by Transmission Electron
by EPA 40 CFR Part 763 Final Rule (ABERA)
4raly11cal Asbestos
DEP Hard Copies (68 Boxes) / DEP Box 45 / 200 RECTOR PL 1065475, 16/7508
NYC-WTC_000114129Machine-extracted title Memo or letterSummary A letter from Milford Management Corp. dated February 26, 2002, enclosing bulk sample and air monitoring results for multiple buildings.
• Air monitoring asbestos testing — dated 9/22/01
10/4/01
DEP Hard Copies (68 Boxes) / DEP Box 45 / 1 BEEKMAN STREET 34 PARK ROW BIN 1001254, 90/13
NYC-WTC_000115397Machine-extracted title InvoiceSummary Invoice from Benjamin Kurzban & Son Co. Inc. for roof cleanup work at 34 Park Row dated October 15, 2002.
Total amount of asbestos-containing
__9 __ Square Feet, and/or _ _._.2_ Linear Feet
aryrSr+riti
a its~.. ~r
CIi 2
NYC-WTC 000115397
DEP Hard Copies (68 Boxes) / DEP Box 45 / 45 PARK PLACE 1079148, 126/9
NYC-WTC_000115886Machine-extracted title Memo or letterSummary Department of Environmental Protection follow-up letter requesting environmental hazard assessment documents and clean-up summaries for 45 Park Place in February 2002.
Director
Asbestos Control Program
NYC-WTC 000115886
DEP Hard Copies (68 Boxes) / DEP Box 45 / 111 READE STREET Block: 145 Lot: 16 BIN: 1001586 AKA's:
NYC-WTC_000114769Machine-extracted title FormSummary License agreement between NYC DEP and a landowner dated July 2002 to remove foreign material from 111 Reade Street.
The work would be
performed by NYSDOL licensed asbestos contractors with DEP and NYSDOL
certified workers.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 112 READE STREET Block: 146 Lot: 11 BIN: 1001598 AKA's: 109-113 West Broadway, 109 West Broadway
NYC-WTC_000114792Machine-extracted title FormSummary DEP license agreement with landowner to remove foreign material from exterior areas of 112 Reade Street near the former World Trade Center site.
The work would be
performed by NYSDOL licensed asbestos contractors with DEP and NYSDOL
certified workers.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 80 PINE STREET 1000880, 39/12
NYC-WTC_000114947Machine-extracted title Memo or letterSummary Department of Environmental Protection letter dated February 2002 requesting bulk sample results and cleanup summaries for 80 Pine Street.
Avaltroni
including asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 330 PEARL STREET Bl. 106 Lot. 7501/1001365
NYC-WTC_000115064Machine-extracted title FormSummary Visual inspection form for a building at 330 Pearl Street documenting facade conditions and ACM locations.
The steps included the professional assessment of building
Fax (718) 595-4422
contamination for possible hazardous components, including asbestos, and
DEP Hard Copies (68 Boxes) / DEP Box 45 / 205 PEARL STREET 1001121, 68/7501
NYC-WTC_000115154Machine-extracted title UnclassifiedSummary Letter dated May 3, 2002 informing the building owner of visible World Trade Center debris found during exterior surveys and requesting cleanup.
The work would be
performed by NYSDOL licensed asbestos contractors with DEP and NYSDOL
certified workers.
DEP Hard Copies (68 Boxes) / DEP Box 45 / 205 PEARL STREET 1001121, 68/7501
NYC-WTC_000115175Machine-extracted title FormSummary Inspection form recording facade survey results for 205 Pearl Street, including checks for debris and asbestos.
Avaltroni
Deputy Commissioner including asbestos.