85 JOHN STREET; Block: 77 Lot: 1 BIN: 1001185 27-31 Gold Street — page 7
Asbestos Containing Material is defined by NYC and NYS his that which contains greater than 1-0 % Asbestos by Weight.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Asbestos Containing Material is defined by NYC and NYS his that which contains greater than 1-0 % Asbestos by Weight.
using asbestos, dust and lead samples were Methodology, Asbestos: Phase Contrast Microscopy (PCM) 1.
Asbestos: trable Dust), 2. Dust: N OSH orp(Rtion romtry Method. 3.
Asbestos: Dust), 2. Dust: NIOSH rOmetry Method. Atom Absorption' 3.
asbestos Regulations.
The asbestos, dust and lead samples were analyzed. using the following methodologies: 1. Asbestos: Phase Contrast Microscopy (PCM) Methodology, 2.
--(JLC) conducted ambient air sampling for JLC Environmental asbestos and lead in Apartments -_-_.
Oliver: ambient air sampling for asbestos, ironmental Consultants, Inc.
Apartment 11B Asbestos and Lead ntrast scopy The asbestos and lead samples
Summary January 2003 letter from Hudson River Management LLC to DEP regarding asbestos air testing and remediation results.
We are enclosing herewith a copy of asbestos ultrasonication test, which show an extremely high level of asbestos (1.3 million
Summary Record from the 55 Liberty Street folder with no readable text visible in the provided excerpt.
The presence of elevated levels of asbestos dust on surf$ees may result in result in increased exposure to asbestos.
one (1) percent asbestos.
Summary Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Mandatory pre-bid meeting notice for asbestos abatement and cleaning at 125 Cedar Street scheduled for August 28, 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Document listing seven contractor companies authorized for asbestos removal and cleanup operations at the WTC site.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.