NYC-WTC_000357757
ATC asbestos microscopy analysis results for samples from World Trade Center project, 2/21/02.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗2002-02-21 – 2002-02-21
machine-extracted · confidence unavailable · Check page ↗Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
NYC-WTC_000357757
ATC asbestos microscopy analysis results for samples from World Trade Center project, 2/21/02.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000357770
NIOSH method asbestos fiber analysis results for WTC project, 2/21/02.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387445
Asbestos fiber analysis by microscopy for World Trade Center project; bulk analysis included.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387459
Asbestos fiber analysis report for World Trade Center project by ATC; microscopy method noted.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this entity's source pages are filed under, largest first. Folder labels are omitted to avoid surfacing personal names.
Design and Construction, Dept. of · Box unavailable · Folder 1 Volume NYC-WTC0009 · 4 source pages