NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Environmental Protection, Dept. of · Box DEP Box 50
machine-extracted · confidence 1.00 · Check page ↗1992-01-01 – 2005-01-05
machine-extracted · confidence unavailable · Check page ↗Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
Air sampling protocol document, 130 Cedar Street, Jan 2005 · page 16machine-extracted · confidence unavailable · Check page ↗
Industry publication, December 2001 · page 107machine-extracted · confidence unavailable · Check page ↗
Illegible document fragment with reference number · page 63machine-extracted · confidence unavailable · Check page ↗
Foundation Specifications for WTC River Intake Relocation · page 59machine-extracted · confidence unavailable · Check page ↗
Foundation Specifications for WTC River Intake Relocation · page 97machine-extracted · confidence unavailable · Check page ↗
Proposal for MEP engineering services dated May 6, 1992 · page 89machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Environmental Protection, Dept. of · Box DEP Box 50
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
Environmental Protection, Dept. of · Box DEP Box 06
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Environmental Protection, Dept. of · Box DEP Box 06
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000165112
Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.
Environmental Protection, Dept. of · Box DEP Box 44
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000165112
Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.
Environmental Protection, Dept. of · Box DEP Box 44
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000166571
Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this entity's source pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0004.
Air sampling protocol document, 130 Cedar Street, Jan 2005 · page 16machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0006.
Industry publication, December 2001 · page 107machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0006.
Illegible document fragment with reference number · page 63machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0006.
Foundation Specifications for WTC River Intake Relocation · page 59machine-extracted · confidence 1.00 · Check page ↗
Foundation Specifications for WTC River Intake Relocation · page 97machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Proposal for MEP engineering services dated May 6, 1992 · page 89machine-extracted · confidence 1.00 · Check page ↗