NYC 9/11 Public Portal Document
DRAFT
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 7 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_21MC100_008701928
NYC-WTC_000455600
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000441967
Draft DEP document detailing scope of work for 114 Liberty Street interior cleaning.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434450
Draft scope of work for interior cleaning and asbestos monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435343
Follow-up scope for interior cleaning and asbestos air monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449032
Draft DEP scope of work outlining asbestos abatement and monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452520
Draft scope of work for interior cleaning and air monitoring of 114 Liberty Street asbestos project.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434549
Scope of work for interior cleaning and asbestos monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433839
Scope of work for asbestos inspection/monitoring and clearance sampling at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449394
Draft scope of work for asbestos interior cleaning and monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445876
Draft scope detailing asbestos abatement oversight and air monitoring at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434775
Scope of work for asbestos cleaning/monitoring at 114 Liberty Street, with lead/PAH sampling notes.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434826
Draft scope for environmental monitoring and asbestos-related air sampling at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433401
Draft DEP record outlining abatement oversight, monitoring and clearance sampling plan.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000441967
Draft DEP document detailing scope of work for 114 Liberty Street interior cleaning.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434450
Draft scope of work for interior cleaning and asbestos monitoring at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435343
Follow-up scope for interior cleaning and asbestos air monitoring at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449032
Draft DEP scope of work outlining asbestos abatement and monitoring at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445876
Draft scope detailing asbestos abatement oversight and air monitoring at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452520
Draft scope of work for interior cleaning and air monitoring of 114 Liberty Street asbestos project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000441967
Draft DEP document detailing scope of work for 114 Liberty Street interior cleaning.
Similar indexed content
NYC-WTC_000434450
Draft scope of work for interior cleaning and asbestos monitoring at 114 Liberty Street.
Similar indexed content
NYC-WTC_000435343
Follow-up scope for interior cleaning and asbestos air monitoring at 114 Liberty Street.
Similar indexed content
NYC-WTC_000449032
Draft DEP scope of work outlining asbestos abatement and monitoring at 114 Liberty Street.
Similar indexed content
NYC-WTC_000452520
Draft scope of work for interior cleaning and air monitoring of 114 Liberty Street asbestos project.
Similar indexed content