NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 36 pages

Draft NYC WTC environmental monitoring chain

Machine-extracted title · confidence 41%

Draft NYC OEM memo on environmental monitoring for World Trade Center-related exposure.

NYC-WTC_000454763–000454798
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

weather is drier (and hence more likely to release dust and fibers). In addition. Project managers may direct that a second (optional) sample be collected in wet weather by way of comparison. In order to help reduce variability between sites, the same cleanup or remediation tasks will be used at all locations (with appropriate decontamination between locations).

Because of the possibility that outside restoration activities might lead to increased exposure to asbestos fibers in air, this activity will be performed by trained staff or contractors with adequate health and safety training and wearing adequate PPE.

Stationary air monitors will be used to collect ambient air samples at two locations: either 5 meters upwind and 5 meters downwind of the restoration area, or the upwind and downwind perimeter of the property (whichever is closer). The direction and speed of the wind will be recorded throughout the restoration event. The equipment operator will wear a personal air sampling pump. Flow rate for both the stationary and personal air pumps will be approximately equal and will be sufficient to collect the minimum target volume specified in Appendix G (70 L), and the sampling durations will also be equal (about 1 hour).

In order to help quantify the impact of the restoration activity on asbestos levels in ambient air, the down-wind stationary air monitor will also be used to collect a pre-activity and a post activity sample as well as a sample during the activity. Both the pre- and the post activity samples will be at a flow rate adequate to yield a minimum volume of 1200 L, collected over a sampling duration of about 3 hours. This sampling scheme is summarized in the following example schedule:

Minimum Target Volume (L) Activity Example Clock time Personal Sampler Stationary Monitor

Pre-sampling 8:00-11:00 1200 Restoration activity 11:30-12:30 70 70 Post activity 1:00-4:00 1200

A downwind aerosol monitor will also be used to monitor dust generation before, during and after the simulated or actual restoration activity.

One dust or debris sample will be collected from each restoration location before activity occurs. This will be accomplished by collecting a 5 point composite (grab samples) of dust or debris in the immediate vicinity of the work. These grab samples will then be composited into a single sample representative of the garden as a whole. Grab samples will be collected from the surface. Sampling and analysis for asbestos will be performed in accordance with methods available for solid media analysis, including PLM, infrared, and scanning electron microscopy (SEM).

Summary of Sampling Design

CITY_21MC100_0 06455402

NYC-WTC_000454781

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454781Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →