Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 No person shall make, continue or cause or permit to be made or continued any unnecessary noise.

Section 1403.3-401

Any act in violation of the provisions of this article of the code is deemed to be in violation of Article 111 of the code, without any way limiting the generality of the provisions of Article 111 of the code.

Section 1403.3-411 Construction Activities

Except as otherwise provided by this section, no person shall engage in or permit any person to be engaged in construction activities in any zone other than weekdays between the hours of 7:00 am and 6:00 pm. (Jason, I will get back to you on this one) Subject to provisions of Section 3.01 of the code, an agency of the City of New York authorized under the Administrative Code to issue permits or licenses authorizing construction activities may, in the case of urgent necessity in the interest of public safety, issue variance from the provisions of a sub-division of this section with respect in any such construction activity. Such variance may be granted for an initial period of up to three days and may be renewed for periods of three days or less while such urgent necessity continues. Such variance shall be clearly marked in such license or permit and shall be prominently posted at the site of such construction activities by the permitee or licensee. A copy of such marked license or permit shall be promptly forwarded to the Board. In the case of emergency, construction activities directly connected to the abatement of such emergency may be undertaken without a variance as herein provided for a period of not to exceed twelve hours from the commencement of such construction during which time application for a variance hereunder shall be made.

Section 1403.3.4.13 Construction Devices

Except as provided in Article V of this code, no person shall operate or use or cause to be operated or use a construction device in such a way as to create an unnecessary noise.

Section 14.3 B-4.19 School. Hospitals. Courts

No person shall cause or permit the creation of any unnecessary noise through the use of any device on any street adjacent to any school or court while the same is in session or adjacent to any hospital.

Section 14.03.3-5.21 Paving Breakers

To be operated only within the allowable sound levels indicated in the code. The Contractor is required to comply with all registration requirements issued under Section 1403.2.09 for air compressors and/or paving breakers used in the performance of the work.

It shall be the responsibility of each Contractor to obtain a copy of the Noise Control Code and

02082-8

CITY_21 MCI 00_014563781

NYC-WTC_000454581

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454581Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →