SECTION 02082
protective equipment is not torn or ripped and that respiratory protection is worn
at all times.
4. Ensure that sufficient personal protective equipment is stored in the clean room.
5. Take precautions to prevent heat stress. Precautions include, but are not limited
to, selecting lightweight protective clothing, reducing the work rate, and
providing adequate fluid breaks.
D. ENGINEERING CONTROLS
1. The 8-hour time weighted average airborne concentration of fibers to which any
passerby may be exposed shall not exceed 0.01 fibers per cubic centimeter of air
when fibers have a physical dimension longer than 5 micrometers as determined
by the method prescribed in these Specifications.
2. All Large asbestos projects shall utilize negative pressure ventilation equipment.
3. The negative pressure ventilation equipment shall operate continuously, 24 hours
a day, from the establishment of isolation barriers through successful clearance air
monitoring. If such equipment shuts off, adjacent areas shall be monitored for
asbestos fibers.
4. A static negative air pressure of 0.02 inches (minimum) water column shall be
maintained at all times in the work place during abatement to ensure that
contaminated air in the Work Area does not filter back to uncontaminated areas.
5. On loss of negative pressure or electric power to the negative pressure ventilating
units, abatement shall stop immediately and shall not resume until power is
restored and negative pressure ventilation equipment is operating again.
6. Negative pressure ventilation equipment shall be exhausted to the outside of the
building away from occupied areas.
(a) At no time shall the negative pressure ventilation unit exhaust
within 40 feet of a receptor or adversely affect the intake ports,
louvers, or entrances for the building or adjacent buildings.
a. Heavy duty ducting of equivalent, or larger, shape and
dimension as that of the negative pressure ventilation
exhaust port shall be used to exhaust to the structure.
b. All ducting shall be sealed and braced or supported to
maintain airtight joints.
7. Where ducting to the outside is not possible, a second negative pressure
ventilation unit compatible with the primary unit’s capacity shall be connected in
series. The area receiving the exhaust shall have sufficient, non-recycling exhaust
capacity to the outside of the stimcture.