NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 114 pages

Asbestos regulatory documentation, NYC WTC 2006

Machine-extracted title · confidence 35%

Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.

NYC-WTC_000453278–000453391
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shall be performed during abatement. (1) Visible accumulations of loose asbestos containing waste material shall be cleaned up using rubber or plastic dustpans and rubber squeegees or HEPA filtered vacuums. Metal shovels may also be used, except in the vicinity of plastic sheeting, critical barriers and isolation barriers, which could be perforated by these tools. To pick up excess water and gross wet debris, a wet-dry HEPA filtered shop vacuum dedicated to asbestos abatement may be used. This cleaning shall be done whenever there is sufficient asbestos waste material to fill a single leak-tight bag/container, or this cleaning shall be done at the end of each work shift whichever shall occur first. Visible debris shall be maintained adequately wet. (2) Work shall stop whenever excessive water accumulation or flooding is present in the area and shall not resume until the water is collected and disposed of properly. (e) Final Cleaning and Clearance Procedures. Final clean-up and clearance procedures for abatement shall comply with Section 56-9, except that only one (1) stage of cleaning (final) is to be performed. Lockdown encapsulant use is not required. (1) Exemption from Project Monitor Visual Inspection. Asbestos projects which are exempt from clearance air sampling requirements at one or two- family owner occupied residential buildings/structures, are also allowed an exemption from the project monitor visual inspection requirements. For asbestos projects utilizing this exemption, once final cleaning is complete, a visual inspection shall be completed by the asbestos abatement contractor’s supervisor to confirm that the scope of abatement work for the asbestos project is complete, and no visible debris/residue, pools of liquid, or condensation remain. The results of this inspection shall be documented by the asbestos abatement contractor’s supervisor in the asbestos abatement contractor daily project log, and once the asbestos project is complete the asbestos abatement contractor’s supervisor shall also obtain the owner’s written acceptance of the final results of the asbestos project within the daily project log. (f) Final Waste Removal From the Site. The requirements of Subpart 56-10 shall apply, once all asbestos project regulated abatement work areas have been completed. 56-11.7 Non-friable Flooring and/or Mastic Removal. The following Phase II abatement procedures shall apply for removal of non-friable asbestos-containing flooring and/or mastic materials including cove base and associated mastic. (Note - Full work area preparation, attached decontamination system enclosures, abatement and multiple cleanings per this Part are required for beadblaster use or other abrasive abatement method.)

(a) Air Sampling and Analysis. Air sampling and analysis on an asbestos project conducted under this Section shall be conducted in accordance with the

12 NYCRR56 Subpart 11, Page 109

CITY_21MC100_011986177

NYC-WTC_000453387

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453387Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →