Environmental Community Air Monitoring Plan, 2005

Machine-extracted title · confidence 46%

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

NYC-WTC_000453085–000453217
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - October 21, 2005

with tape to hold the cassette securely in place and to provide a surface to identify the cassette. At the end of the sampling period, the top cover and small end caps are replaced. Samples are transported upright to the laboratory in a rigid container with packing material to prevent jostling or damage. To avoid electrostatic forces from causing fiber loss from the sampling filter, untreated polystyrene foam will not be used for any of the shipping container materials. Samples for asbestos will be collect using two different media to accommodate the SEM and TEM analyses. Equipment and supplies utilized with this sampling approach are as follows:

• Area Sampling Pump - 5 to 15 1pm. • Eilters/TEM analysis - Mixed cellulose ester membrane filters, 0.45-Lim pore size, with a non-conductive cowl, supported by a cassette filter holder, suitable for connection with the personal monitoring pump system. • Filters/SEM analysis -Polycarbonate filters, 01.pm pore size with 25 mm diameter cassette. • High Flow Rotometer - 2.0 to 20.0 1pm

10.2.4 Respirable Crystalline Silica and Dust

Respirable dust and crystalline sampling will be performed according to NIOSH Method 0600 - Particulates Not Otherwise Regulated, Respirable following the recommendations for personal sampling. Samples will be collected at a rate of approximately two liters per minute (21pm) for a minimum of eight (8) hours for a resulting total air volume of approximately 1.0 ms. To ensure optimum accuracy, the sampling rate will be adjusted, as needed, not to exceed 2 mg dust loading on the filter. Filters are pre-weighed to a constant weight in the controlled weighing area. If static electricity is evident (e.g., filter not releasing easily from the forceps or it attracts the balance pan), the filter should be passed over an anti-static radiation source. Filters are assembled in the filter cassettes and the cassettes closed firmly by placing a plug at each opening of the cassette to prevent leakage around the filter. For at least 2 hours prior to sampling, the filters are equilibrated in either an environmentally controlled weighing area or chamber. Pump flow rates of each personal sampling pump, with a representative sampler in line and cyclone grit pot in place, will be measured before and after sample collection. The pump will be run for 10 minutes prior to checking the flow rate. A suitable rotometer (or bubble meter) will be connected to the filter inlet, the flow screw adjusted to the desired sampling value, and the flow rate observed on the rotometer (or bubble meter) will be verified as constant for a minimum of 20 seconds. Flow rates will be recorded on Field Sampling Data Sheets or an equivalent field logbook. The cyclone’s grit cap is removed prior to use and the interior inspected. If the inside is visibly scored, replace the cyclone because the dust separation characteristics may be altered. Clean the interior of the cyclone to prevent re-entrainment of large particles. Assemble the sampler head checking for alignment of the filter holder and cyclone in the sampling head to prevent leakage. Care must be taken to prevent the sampler assembly from inverting at any time. Immediately prior to collecting a sample, the sampler will be

57

CITY_21MC100_003238102

NYC-WTC_000453141

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453141Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441133

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

Compare copies and versions →