NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 133 pages

Environmental Community Air Monitoring Plan, 2005

Machine-extracted title · confidence 46%

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

NYC-WTC_000453085–000453217
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - October 21, 2005

responsible for an internal verification of the transcribed inforaiation. Daily external verification of the field analysis records by the AIRTEK Field Sampling Coordinator, or designee, will ensure that:

• Logbooks and standardized forms have been filled out completely and that the information recorded accurately reflects the activities that were performed. • Records are legible and in accordance with good record keeping procedures, i.e., entries are signed and dated, data are not obliterated, changes are initialed, dated, and explained. • Calibration procedures were conducted in accordance with the protocols described in the QAPP, and that any deviations were documented and approved by the appropriate personnel.

16.1.3 Fixed Laboratory Data

16.1.3.1 Internal Reviews

Prior to the release of any data from the laboratory, the data will be verified and approved by laboratory personnel. This review will consist of a tiered review by the person performing the work, a qualified peer, and by supervisory personnel. Each laboratory used in the program has a procedure in place for documenting all levels of data review. Prior to being released as final, laboratory data will proceed through a tiered review process. Data verification starts with the analyst or technician who performs a 100 percent review of the data to ensure the work was done correctly the first time. It is the responsibility of the analyst or technician to ensure that the verification of data in his or her area is complete. The data reduction and initial verification process must ensure that:

• Sample preparation and analysis information is correct and complete, • Results are correct and complete, • The appropriate methods have been followed and are identified in the project records, • Proper documentation procedures have been followed, • All nonconformances have been documented, • Project-specific requirements have been met.

Following the completion of the initial verification by the analyst or technician, a systematic check of the data will be performed by an experienced peer, Laboratory Section Leader, or designee. This check will be performed to ensure that initial review has been completed correctly and thoroughly. Included in this review will be an assessment of the acceptability of the data with respect to:

• Adherence of the procedure used to the referenced methods and specific instructions.

119

CITY_21MC100_003238164

NYC-WTC_000453203

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453203Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441133

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

Compare copies and versions →