NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos inspection plan, NY Department of Labor

Machine-extracted title · confidence 41%

Asbestos Part 56 inspection reference document, NYC.

NYC-WTC_000451646–000451756
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(e) Building/structure Asbestos Survey Requirements. The asbestos survey shall include a thorough inspection for and identification of all PACM, suspect miscellaneous ACM, or asbestos material throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or to have repair work. The required inspection shall be performed by a certified asbestos inspector, and, at a minimum, shall include identification of PACM, suspect miscellaneous ACM or asbestos material by all of the following methods:

(1) The review of building/structure plans and records, if available, for references to asbestos, ACM, PACM, suspect miscellaneous ACM or asbestos material used in construction renovation or repair; and

(2) A visual inspection for PACM and suspect miscellaneous ACM throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or repaired. For the purpose of this Part, all PACM and suspect miscellaneous ACM visually assessed shall be treated and handled as ACM and shall be assumed to be ACM, unless bulk sampling is conducted as per this section, standard EPA and OSHA accepted methods, including multi-layered systems sampling protocols; the subsequent analyses are performed by a laboratory that meets the requirements of Section 56-4.2 of this Part; and the analyses satisfies both ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material.

(f) Building/structure Asbestos Survey Information.

(1) The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations, quantities, friability and conditions of all types of installations at the affected portion of the building/structure relative to the ACM, suspect miscellaneous ACM, PACM or asbestos material contained therein. The following list is not inclusive of all types of ACMs, it only summarizes typical ACMs. The certified asbestos inspector is responsible for identification and assessment of all types ACM, PACM, suspect miscellaneous ACM and asbestos material within the affected portion of the building/structure:

PACM

(i) Surfacing Treatments:

(a) Fireproofing;

(b) Acoustical Plaster;

Finish Plasters; and

(d) Skim Coats of Joint Compound.

12 NYCRR56 Subpart 5, Page 42

CITY_21MC100_003243845

NYC-WTC_000451688

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451688Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →