NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos inspection plan, NY Department of Labor

Machine-extracted title · confidence 41%

Asbestos Part 56 inspection reference document, NYC.

NYC-WTC_000451646–000451756
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(cn) Personal Protective Equipment (PPE). Disposable work suits or coveralls, head covering, eye protection, footwear, gloves and appropriate NIOSH- approved respirators with appropriate NIOSH-approved filters.

(co) Plasticize. To cover floors, walls, ceilings or other surfaces with 6-mil fire- retardant plastic sheeting.

(cp) Presumed Asbestos Containing Material (PACM). All Thermal System Insulations and Surfacing Materials found in buildings constructed no later than 1980. PACM is considered to be ACM unless proven otherwise by appropriate bulk sampling and laboratory analyses.

(cq) Project Air Sampling. Area air sampling conducted in accordance with Subpart 56-4 of this Part during the course of the asbestos project.

(cr) Project Designer. Any person who performs the duties described at Section 56- 3.2(d)(7) of this Part.

(cs) Project Monitor. Any person who performs the duties described at Section 56- 3.2(d)(8).

(ct) Public. Any natural person except:

(1) A person engaged in an asbestos project;

(2) An authorized visitor;

(3) Police, fire, or other public safety personnel.

(cu) Receptor. Any opening, which could admit asbestos fibers into a structure if not properly protected. Examples include but are not limited to operable windows, doors, vents, air intakes or exhausts of any mechanical device within a building or structure.

(cv) Regulated Abatement Work Area. The portion of the restricted area where abatement work actually occurs. For tent work areas, the interior of each tent is a regulated abatement work area. For OSHA Class I and Class II asbestos abatement, the interior of the restricted area containment enclosure is the regulated abatement work area. For exterior non-friable asbestos abatement conducted without the establishment of negative air ventilation systems or containment enclosures, the entire restricted area surrounding the abatement location is considered to be the regulated abatement work area.

(cw) Regulated Asbestos-Containing Material (RACM). Friable ACM or PACM, Category I Non-friable ACM that has become friable or has been or will be subjected to sanding, grinding, cutting or abrading, or Category II Non-friable ACM that has a high probability of becoming or has become crumbled.

12 NYCRR56 Subpart 2, Page 15

CITY_21MC100_003243818

NYC-WTC_000451661

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451661Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →