Quality Assurance Plan, Environmental Monitoring

Machine-extracted title · confidence 50%

QA plan for environmental air monitoring and waste management at NYC sites.

NYC-WTC_000451195–000451304
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Slreet/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

2.0 TABLE OF CONTENTS I.O TITLE AND APPROVAL SHEET............................. ....... I 2.0 TABLE OF CONTENTS............................................. ......3 3.0 DISTRIBUTION LIST.................................................. .......9 3.1 Distribution List................................................................ ...... 9 4.0 PROJECT ORGANIZATION ..................................... ......12 4.1 Project Organization Chart............................................. .... 12 4.2 Communication Pathways.............................................. ..... 12 4.2.1 Modifications to Approved QAPP.............................. ... 12 4.3 Personnel Responsibilities and Qualifications............... ..... 14 4.3.1 Management Responsibilities..................................... ...14 4.3.2 Quality Assurance Responsibilities............................ ... 15 4.3.3 Field Responsibilities.................................................... ...15 4.3.4 Laboratory Responsibilities........................................ ...16 5.0 SPECIAL TRAINING NEEDS/CERTIFICATION ••••••••••••••••••••••••••••••••••••••••••••• 20 6.0 PROBLEM DEFINITION/BACKGROUND........................................................... 21 6.1 Problem Definition/Site History and Background. 21 6.2 Project Purpose and Objectives............................. 24 6.3 Project Action Levels............................................... ,.25 6.3.1 Decisions Based on Project Action Levels....... .27 6.3.2 Target Air Quality Levels................................... .27 6.3.2.1 Definitions of Exceedances.............................. 27 6.3.2.2 Actions Based on Exceedances........................ 27 6.3.3 USEPA Site Specific Trigger Levels.................. 28 6.3.3.1 Definition of Exceedances............................... 28 6.3.3.2 Actions Based on Exceedances........................ 28 7.0 PROJECT/TASK DESCRIPTION..................... ... 29 7.1 Project Overview.................................................... ..29 7.1.1 Sampling Tasks..................................................... 30 7.1.2 Analytical Tasks................................................... .39 8.0 QUALITY OBJECTIVES AND CRITERIA FOR MEASUREMENT DATA. 41 8.1 Project Quality Objectives.............................................................. ..41 8.2 Measurement Performance Criteria............................................... ... 44 8.2.1 Precision.......................................................................................... .44 8.2.2 Accuracy........................................................................................ .45 8.2.3 Representativeness........................................................................ ,55 8.2.4 Comparability................................................................................ .56 8.2.5 Sensitivity...................................................................................... . 56 8.2.6 Completeness................................................................................ .............................57 9.0 NON-DIRECT MEASUREMENTS (SECONDARY DATA) ........................... 58 lO.O FIELD MONITORING REQUIREMENTS ........................... 59 10.1 Monitoring Process Design................................................................ 59 10.1.1 Meteorological Data Collection..................................................... 59 10.2 Monitoring Methods.......................................................................... 59 10.2.1 Metals (TSP Filters)........................................................................ 59 10.2.2 Mercury (Gas).................................................................................. 60 10.2.3 Asbestos........................................................................................... . 61 10.2.4 Respirable Crystalline Silica and Dust......................................... , 62 10.2.5 Polychlorinated Dibenzodioxins (PCDDs) and Polychlorinated

3

CITY_21MC100_0 03221656

NYC-WTC_000451197

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451197Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content