NYC-WTC_000449765
Final TEM air analysis report dated 3/28/2005 for building 4 in Monroeville project.
10 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗TEM air analysis report; date 3/28/2005; building 4.
NYC-WTC_000450780–000450782OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
RJ Lee Group, Inc. Laboratory Report (cont’d) RJ Lee Group Job No: ATH411066-472 RJ Lee Group, Inc. Building: 4 Albany Report Date: 3/28/2005
Concentration Date-Time Collected Filter Area Asbestos Analytical RJLG Sample Sample Start Area Volume Analyzed Structures Sensitivity Number Type Stop ■Sub Location / Comments- (mrr?) (liter) (mrrf) Chry Amph (S/mnf) (S/cc)
5250017.HT Area 3/25/2005 - 11:13:00 (NorthEast) - Temporary WTC 385 4059.00 0.13501 0 0 7.4 <0.001 3/26/2005 - 02:15:00 Waste Holding Area Entrance. '7.4 ROOf
Authorized Signature:/sIb Kimberly A. Allison, Manager - TEM Analysis
Notes: 1. Volumes provided by Deutsche Bank were used to calculate analytical results and sensitivities. 2. “<” indicates results less than analytical sensitivity. “—” indicates that sample was not analyzed. 3. Sample(s) for this project were analyzed at our: Monroeville, PA (NVLAP #101208-0, NY ELAP #10844) facility. 4. If RJ Lee Group, lire, did not collect tire samples analyzed, tire verifiability of the laboratoiy's results ai e limited to tlie reported values. 5. Abbreviations: N/A-Not Applicable, Chry-Chrysotile Asbestos, Amph-Amphibole Asbestos, S-Structures. 6. Samples will be held for 90 days and then disposed of per Federal regulations. 7. These results are submitted pursuant to RJ Lee Group’s current terms and conditions of sale, including the company’s standard warranty and limitation of liability provisions. No responsibility or liability is assumed for tlie maimer in which tliese results are used or interpreted.
Page 2 of 3
CITY_21MC100_003227652
NYC-WTC_000450781
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000449765
Final TEM air analysis report dated 3/28/2005 for building 4 in Monroeville project.
10 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445863
Final TEM air analysis, March 28, 2005.
10 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445838
Final TEM air analysis laboratory report for building 4, date March 31, 2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452587
Final TEM air analysis report for building at 350 [name], March 2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444086
Final TEM air analysis report from RJ IceGroup for Building 4; date 2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448034
Final TEM air analysis report for building 4, 03/30/2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453073
Final TEM air analysis laboratory report for Building 4, 2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445128
Final TEM air analysis lab report for building 4, dated March 2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445962
TEM air analysis final report for Building 4, dated 2/27/2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448666
Final TEM air analysis report for a building site, date 3/13/2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447415
TEM air analysis report for Building 4, dated 3/18/2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452477
TEM air analysis final lab report for Building 4, 3/18/2005.
10 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000449765
Final TEM air analysis report dated 3/28/2005 for building 4 in Monroeville project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445863
Final TEM air analysis, March 28, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233216
Final laboratory report for TEM air analysis of a building sample collected in March 2005, conducted by RJ IjceGroup.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442135
Final TEM air analysis lab report for building 4 [name], dated 3/28/2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445965
Final TEM air analysis report for Building 4, date 3/28/2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234307
Final laboratory report for TEM air analysis of a building sample collected in March 2005, conducted by RJ IjceGroup.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Final TEM air analysis report dated 3/28/2005 for building 4 in Monroeville project.
Similar indexed content
NYC-WTC_000445863
Final TEM air analysis, March 28, 2005.
Similar indexed content
Final TEM air analysis laboratory report for building 4, date March 31, 2005.
Similar indexed content
Final TEM air analysis report for building at 350 [name], March 2005.
Similar indexed content
NYC-WTC_000444086
Final TEM air analysis report from RJ IceGroup for Building 4; date 2005.
Similar indexed content