Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 66%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

NYC-WTC_000449908–000450039
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 96 of 124

Table 13-3c. Calibration Requirements for PS-1 Samplers Equipment Activity Acceptance Corrective Action Criteria PS-1 sampler Initial Calibration: NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration Single point flow check Within + 20% of the Service PS-1 sampler at normal operating flow flow rate indicated by and perform a new rate on monthly basis the PS-1 sampler multi-point calibration. Orifice Transfer Annual calibration by NA NA Standard manufacturer and when visual inspection reveals new dents in the device.

Calibration records maintained and tracked by Quality Assurance Officer and Field Sampling Coordinator.

PMio and PNC s Using a Reference Sampler

Calibration procedures are as follows:

• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration. The calibration records will be maintained and tracked by the Quality Assurance Officer and Field Sampling Coordinator.

• Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed +10% of the samplers indicated flow rate.

PMio andPMis Using a Met One E-BAM Continuous Monitor

Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates matches the serial number of the E-BAM to be calibrated. If Zero or Span tests fail, re-run the test. If failure continues, clean the detector and re-run the test. If failure persists, contact the manufacturer.

CITY_21MC100_003218142

NYC-WTC_000450004

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000450004Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →