Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 96 of 124
Table 13-3c. Calibration Requirements for PS-1 Samplers Equipment Activity Acceptance Corrective Action Criteria PS-1 sampler Initial Calibration: NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration Single point flow check Within + 20% of the Service PS-1 sampler at normal operating flow flow rate indicated by and perform a new rate on monthly basis the PS-1 sampler multi-point calibration. Orifice Transfer Annual calibration by NA NA Standard manufacturer and when visual inspection reveals new dents in the device.
Calibration records maintained and tracked by Quality Assurance Officer and Field Sampling Coordinator.
PMio and PNC s Using a Reference Sampler
Calibration procedures are as follows:
• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration. The calibration records will be maintained and tracked by the Quality Assurance Officer and Field Sampling Coordinator.
• Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed +10% of the samplers indicated flow rate.
PMio andPMis Using a Met One E-BAM Continuous Monitor
Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates matches the serial number of the E-BAM to be calibrated. If Zero or Span tests fail, re-run the test. If failure continues, clean the detector and re-run the test. If failure persists, contact the manufacturer.
CITY_21MC100_003218142
NYC-WTC_000450004
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content