NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 66%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

NYC-WTC_000449908–000450039
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 93 of 124

Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed __________ Laboratory Analyses_________________________ Paranieter/Instrunient _______________ Maintenance, Testing, and Inspection Activities________ Dioxins & Furans/HRGC/ Check connections. IIRMS Replace disposables. Perform injection port maintenance. Clip column. Perform leak checks. Clean detector.______________________________________________________ Asbestos/TEM Align and check TEM scope. Calibrate for Al/Cu EDX response daily.______ Silica/XRD Check daily for Si-primary peak, displacement, and detector resolution. Mercury/CVAFS Check fittings, rinse and refill DDIW bottle, prepare new pretraps, blank each analytical trap. Soak bubblers in 1 % KOH solution. Change traps, replace lamps, clean/charge quartz cell. Inspect tubing, replace fittings, prepare new stock standards._______________ PMio Annual calibration of balance by outside certification. __________________ PM2.5 Annual calibration of balance by outside certification. ^ Annual calibration records will be maintained by the Quality Assurance Officer,

The maintenance responsibilities for fixed laboratory instruments will be assigned to the Laboratory Section Managers. Laboratory analysts will be responsible for daily checks and calibrations and for reporting any problems with the instruments. The maintenance schedule will follow the manufacturer’s recommendations. Laboratory personnel will also be responsible for ensuring that critical parts are kept with the fixed laboratory instruments. Critical spare parts will be immediately available to reduce potential downtime. The inventory will primarily contain parts that are subject to frequent failure, have limited useful lifetimes, and/or cannot be obtained in a timely manner.

Annual preventative maintenance service visits will involve cleaning, adjusting, inspecting, and testing procedures designed to minimize product failure and/or extend the product’s life. Between visits, laboratory analysts will be responsible for performing routine operator maintenance and cleaning in accordance with the manufacturer’s specifications.

13.2 Instrument/Equipment Calibration and Frequency

13.2.1 Field Equipment

All materials, including standards or standard solutions, will be dated upon receipt, and will be identified by material name, lot number, purity or concentration, supplier, recipient’s name, and expiration date. All materials must be National Institute of Standard and Technology (NIST)- traceable reference materials.

CITY_21MC100_003218139

NYC-WTC_000450001

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000450001Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →