NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 66%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

NYC-WTC_000449908–000450039
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 30 of 124

7.1.1 Sampling Tasks

Sampling phases will consist of the following segments: Background, Phase I - Preparation Phase and Phase 1 - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented in the Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project, August 2005. Sampling methods, sampling QC, sample handhng and custody are discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a general summary of target parameters, and numbers of field samples and QC samples expected to be collected on a weekly basis for each phase of the program. Tables 7-2 and 7-3 provide a summary of sampling frequencies after the background phase has been completed. Sampling locations are noted on Figures 7-1 and 7-2. Table 7-4 summarizes the sampling locations and the expected use of the data at each location. Photographs of each site are included in Attachment A.

Background

The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed immediately prior to the start of Phase I - Preparation Phase activities. Samples will be collected at five (5) stations (4 ground level and 1 roof top location located on the roof of the fire house [FDNY 10-10 House]) in the monitoring network. All target parameters will be collected over a 24-hour integrated period with the exception of asbestos, silica, PMio, PM2.5, and mercury. Mercury will be monitored utilizing a direct read mercury analyzer. PMm and PM2.5 will be monitored continuously at each of the five (5) sites while asbestos and silica measurements will be taken at a frequency of once per work shift at each of the sites.

Phase I: Preparation and Asbestos and COPC Abatement and Removal

During the Phase I (abatement phase) air monitoring will take place at twelve (12) stations each day. During the first three (3) days only of Phase I Abatement work, samples will be collected and analyzed for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, sampling for semivolatile organics will be reduced to a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The schedule will be repeated until project completion.

The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDs, PAHs and PCBs. The station with the highest 24-hour average PMio concentration (ug/m’) recorded with a collocated organic sample each week will be selected for semivolatile organic analyses.

CITY_21MC100_003218076

NYC-WTC_000449938

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000449938Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →