NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
NYC-WTC_000449908–000450039OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 6 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 23 of 124
safely deconstructed in compliance with applicable law to allow for redevelopment of the WTC Site.
Phase n will include the systematic floor-by-floor deconstruction and removal of the remaining “clean” building components including the clean exterior curtain wall, roof, CMU shafts, concrete deck, large scale mechanical equipment components and structural steel components. Included in Phase II will be the abatement and removal of roof-top asbestos-containing cooling tower transite materials, roof-top caulking and asbestos-containing caulking found on the aluminum column covers and fascia. For each specific floor or regulated abatement work area, all Phase II asbestos abatement work must be completed prior to commencement of any Phase II floor-by-floor deconstruction for that floor or work area.
The deconstruction of the building at 130 Liberty Street is expected to consist generally of: (a) cleaning and preparation of the building for deconstruction; (b) deconstructing the building; (c) undertaking environmental monitoring during the deconstruction; (d) transporting and disposing of all waste and debris from the building; and (e) backfilling, grading and paving the Site as appropriate following the cleaning and deconsti-uction.
Regulatory Oversight
The LMDC is the owner of 130 Liberty Street and is fully responsible for the cleaning and deconstruction of the building. As a City/State agency that is federally funded through HUD, the LMDC must comply with all Federal, State and City regulations pertaining to environmental protection, asbestos abatement, hazardous material disposal and construction. The LMDC released the draft Phase I deconstruction plan in December, 2004 and formally submitted the plan for review to the following agencies:
• United States Environmental Protection Agency • United States Occupational Safety and Health Administration (OSHA) • New York State Department of Labor (NYSDOL) • New York State Department of Environmental Conservation (NYSDEC) • New York City Department of Environmental Protection (NYCDEP) • New York City Department of Buildings • New York State Department of Transportation • New York City Department of Transportation • New York City Office of Emergency Management - Fire Department of New York - New York Police Department - New York City Department of Health and Mental Hygiene
CITY_21MC100_003218069
NYC-WTC_000449931
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content