Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 66%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

NYC-WTC_000449908–000450039
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 15 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 113 of 124

15.0 ASSESSMENT/OVERSIGHT

15.1 Assessments

Technical system audits (TSAs) of both field and laboratory activities are conducted to verify that sampling and analysis are performed in accordance with the procedures established in the QAPP.

Field Sampling TSAs

A system audit of field activities including sampling and field measurements may be conducted and documented by the TRC Project QA Officer (or her designee) quarterly or at the start of each phase of sampling. The purpose of this audit is to verify that all established procedures are being followed as planned and documented and to allow for timely corrective action, reducing the impact of the nonconformance. The audit will ensure that all personnel have read the QAPP. The audit will cover field sampling records, field measurement results, field instrument operation and calibration records, sample collection, preservation, handling, and packaging procedures, adherence to QA procedures, personnel training, sampling procedures, review of sampling design versus the sampling plan, corrective action procedures, and chain-of-custody, etc. Follow-up surveillance will be conducted by the TRC Field Sampling Coordinator to verify that QA procedures are maintained throughout the investigation.

Upon completion of the audit, the TRC Project QA Officer will prepare a written audit report, which summarizes the audit findings, identifies deficiencies and recommends corrective actions. In addition, a verbal debriefing will also be given to the TRC Field Sampling Coordinator and TRC Project Manager at the time of the audit. The written report will be submitted to the TRC Project Manager, who will be responsible for ensuring that corrective measures are implemented.

Fixed Laboratory TSAs

Laboratory audits may be conducted by the TRC Project QA Officer or by a designated qualified individual. If data quality issues are consistently noted during data validation, this may trigger the need for a laboratory audit. The fixed laboratory TSA includes a review of the following areas:

• QA organization and procedures (including the Laboratory QA Plan), • Personnel training and qualifications, • Facility security • Sample log-in procedures, • Sample storage facilities, • Analyst technique • Adherence to analytical methods and the QAPP,

CITY_21MC100_003218159

NYC-WTC_000450021

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000450021Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →