NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Quality Assurance Plan, Ambient Air Monitoring Program

Machine-extracted title · confidence 60%

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

NYC-WTC_000449648–000449764
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z ■< Z ■<

o Ambient Air Monitoring Program Section No. 13 o co g Quality Assurance Project Plan Revision No.: 0

I o 130 Liberty Street - NY, NY Date: August 2005 “0 o Lower Mairliattan Development Corporation Page 91 of 116 c o CT o o' CD "0 o Ca3 CD Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses 03 Parameter/Instrument Frequency of Calibration Acceptance Criteria Corrective Action O o Continuing Calibration Verification RRFs must be within + 20% of initial o c (BCS 3): beginning and end of each calibration mean RRF for unlabeled 3 12 hour shift or batch, whichever is standards and + 30% for labeled CD 3 smaller standards; verify GC column performance and isomer specificity. S/N ratio must be > 10:1 for labeled standaids and >5:1 for unlabeled standards. PAHs/GC/MS Initial Calibration: prior to sample % RSD of RRFs must be < 30 for all Perform necessary equipment analysis or whenever indicated by standards; S/N ratio must be > 10:1 maintenance and check calibration continuing calibration for labeled standards and > 2.5:1 for standards. unlabeled standards. Initial Calibration Verification: 70-130% of true value Immediately after the initial calibration curve__________________ Continuing Calibration: prior to RRFs must be within + 30% of initial analysis at beginning of each 12-hour calibration mean RRFs; S/N ratio shift must be > 10:1 for labeled standards and > 2.5:1 for unlabeled standards. PCBs/GC/ECD Initial Calibration: prior to sample % RSD of CFs must be < 20 Perform necessary equipment analysis or whenever indicated by maintenance and check calibration continuing calibratiorr standards. Initial Calibration Verification: 85-115% of true value immediately after the initial calibration curve Continuing Calibration: beginning of CFs must be within 15% of initial each day, every 10 samples, and at calibration mean CFs Q end of analytical sequence H K I

s o o o I o o co CO L2005-346 Rev. 1 CO co

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000449739Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000428324

Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000427221

Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

Compare copies and versions →