Quality Assurance Plan, Ambient Air Monitoring Program

Machine-extracted title · confidence 60%

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

NYC-WTC_000449648–000449764
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 1301 jberty Street - NY, NY Date: August 2005 Lower Manhattan Development Coi-poration Page 31 of 116

Table 7-2. Phase I: Preparation Phase & Asbestos and COPC Abatement and Removal Sampling and Analysis Summary Location Farameter(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Ground/Street 1. Asbestos Each Day (asbestos and 1. TEM/SEM Level 2. Silica silica are sampled during 2. XRD (4 Locations) work shift) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodatedCarbon Trap/CVAES 8. PMio Continuously “Real-Time” 8. EBAM/Gravimetric 9. PM2.5 Each Day (PMio and PM2.5 9. EBAM/Gravimetric on 24 hour basis at each location; PMio and PNL i reference sampler at 1 location per day on 24- hour basis with location changed monthly) Roof Top and 1. Asbestos Each Day (asbestos and 1. TEM/SEM Scaffolding 2. Silica silica are sampled during 2. XRD (4 locations on roof work shift) top and 4 locations 3. Metals Each Day (24 hr. Basis) 3. ICP/MS on scaffolding) 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/CVAES 8. PMio Continuously “Real-Time” 8. EBAM/Gravimetric 9. PM2.5 Each Day (PMio and PM2.5 9. EBAM/Gravimetric on 24 hour basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly)

L2005-346 Rev. 1

CITY_21MC100_003239324

NYC-WTC_000449679

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000449679Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000428324

Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000427221

Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

Compare copies and versions →