Ambient Air Monitoring Program, 130 Liberty Street

Machine-extracted title · confidence 55%

Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.

NYC-WTC_000449611–000449643
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1.2 Project Purpose and Objectives

The principal pui-pose of the air monitoring program is to monitor air quality in the vicinity of 130 Liberty Street during the deconstruction of the building on that property. The Proposed Plan consists of monitoring of dusts in the vicinity of the deconstruction site on both a real-time or continuous basis as well as a time-weighted or integrated basis.

Principal objectives of the program are as follows:

Monitor dusts as PMw and PM2.5 on a real-time or continuous basis such that dust associated with the building deconstruction are maintained below target and trigger action levels.

In the event that dust levels exceed target and trigger action levels, building deconstruction management personnel will be immediately notified so that all necessary corrective actions can be taken.

Monitor PMio and PM2.5 on a time weighted or 24-hour average basis to provide assurances that levels of respirable particulate matter associated with the deconstruction are below 24 hour National Ambient Air Quality Standards (NAAQS) of 150 iig/iik and 65 ug/m^, respectively.

Collect particulate matter on a time-weighted or integrated basis such that samples are available for monitoring of target compounds potentially associated with World Trade Center dust (e.g., asbestos, lead).

Compare measured concentrations of project target parameters to action levels established on a compound specific basis. In the event that measured concentrations exceed any project specific action level for one or more of these target compounds, appropriate corrective actions immediately will be taken.

1.3 Overview of Air Quality Monitoring Programs and Features

There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 130 Liberty Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:

“Level 1”: The subcontractors performing aspects of Phase I deconstruction work (largely interior, non-structural efforts) will be responsible to collect air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA.

• “Level 2”: The next layer of sampling is for New York State, Title 12, NYCRR Part 56 (ICR 56) compliance. ICR 56-required sampling will be performed by the third party consultant who will sample the ambient air inside the building during Phase I work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In

130 Liberty Street Deconstruction Plan 2 Firialrevised 082605 Section 2 - Ambient Air Monitoring Program

CITY_21MC100_0 02651540

NYC-WTC_000449615

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000449615Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000421851

Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.

Similar indexed content

NYC-WTC_000421884

Final Revised ambient air monitoring plan for 130 Liberty Street; August 24, 2005.

Similar indexed content

Compare copies and versions →