NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos Part 56, NYC-WTC

Machine-extracted title · confidence 41%

New York City Part 56 asbestos documentation, NYC-WTC.

NYC-WTC_000448811–000448923
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SUBPART 56-2 DEFINITIONS

56-2.1 Terms. As used in or in connection with this Part, the following terms mean:

(a) Abatement. Any portion of an asbestos project that includes procedures to control fiber release from asbestos containing material. This includes removal, encapsulation, enclosure, repair, or handling of asbestos material that may result in the release of asbestos fiber.

(b) Accepted Methods/Methodologies. Procedures, regulations, or standards, which are published by recognized standards organizations (e.g. NIOSH, ASTM, ANSI), or are included within federal, state or local governmental regulations (e.g. OSHA, USEPA).

(c) Active Project. A project becomes active when construction of the personal decontamination unit is required to be commenced, or when ACM, PACM or asbestos material is disturbed, whichever comes first, and is considered active until completion of Phase HD, unless, in response to a written request, permission is granted by the Department of Labor Engineering Services Unit to suspend the work on the project for a specified time period.

(d) Additional Contractual Work. Additional asbestos abatement work not originally included within the NYS DOL asbestos project notification.

(e) Adequately Wet. Sufficiently mix or penetrate a material with amended water to prevent the release of visible emissions. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted.

(f) Aggressive Air Sampling. An accepted method of sampling in which mechanical equipment is used before and during the sampling period to stir up settled dust/asbestos fibers.

(g) Agricultural Building/Structure. A building/structure which is or was used exclusively for agricultural or horticultural activity. This definition does not include converted structures or buildings currently used for residential purposes or the processing or retail merchandising of agricultural or horticultural commodities.

(h) Airlock. A system for permitting entrance and exit, while restricting air movement, between a contaminated area and an uncontaminated area.

(i) Air Sampling. The process of measuring the fiber content of a known volume of air collected during a specific period of time, using accepted methodologies.

12 NYCRR56 Subpart 2, Page 7

CITY_21MC100_004988466

NYC-WTC_000448818

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448818Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →