NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

NYC DEP chain-of-custody, Part 56

Machine-extracted title · confidence 60%

DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.

NYC-WTC_000448332–000448441
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7.11 (f)(1) to surround the area of disturbance. The tent shall be sealed to the surfaces beyond the limits of contamination, and those surfaces of the tent enclosure (wall, ceiling, or floor) shall not require plastic sheeting. An attached airlock is required. (3) Due to the nature of this work, background air samples shall not be required. (4) Methods shall be employed to minimize further disturbance of the affected material during cleanup activities. No removal of undisturbed ACM, PACM or asbestos material shall be allowed during the incidental disturbance cleanup emergency asbestos project. (5) Visual Inspection. Once final cleaning is complete, a visual inspection shall be completed by the supervisor to confirm that the scope of abatement work for the asbestos project is complete, and no visible debris, pools of liquid, or condensation remain. (6) Removal of Personal Protective Equipment. The worker’s disposable protective clothing shall be removed and left in the incidental disturbance work area upon exiting. (7) Exiting Procedures. After exiting the tent, workers shall immediately don clean protective clothing within the attached airlock. Workers shall then proceed immediately to a shower for decontamination. (8) After cleanup of debris caused by the incidental disturbance, a visual inspection followed by completion of clearance procedures, shall be performed consistent with the requirements of Subpart 56-9. 56-11.3 Minor Asbestos Projects.

(a) Air Sampling and Analysis. Air sampling and analysis on a minor asbestos project conducted under this Section shall be conducted in accordance with the requirements of Subpart 56-4 of this Part. (b) Where Allowed. For asbestos projects with abatement of less than ten (10) square feet or twenty-five (25) linear feet of ACM, PACM or asbestos material. Phase II Minor asbestos project abatement procedures as per this Section may be complied with in lieu of full compliance with Sections 56-7 through 56-9. All other requirements of this Part shall apply. Only an isolated event necessary for repair associated with normal operation and maintenance activities shall be considered a minor asbestos project. Minor asbestos project corrective actions shall include limited enclosure, spot repair/patching, incidental disturbance clean­ up, spot removal, and spot encapsulation. All corrective actions except spot removal shall be performed using non-asbestos material. Repairs where spot removal has occurred shall also utilize non-asbestos material. (c) Ventilation for Power Tools. Power tools used to drill, cut, or otherwise disturb asbestos material in Minor size regulated abatement work areas, shall be equipped with HEPA-filtered local exhaust ventilation.

12 NYCRR56 Subpart 11, Page 98

CITY_21MC100_003234547

NYC-WTC_000448429

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448429Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →