NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

NYC DEP chain-of-custody, Part 56

Machine-extracted title · confidence 60%

DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.

NYC-WTC_000448332–000448441
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(a) Simultaneous Abatement. Simultaneous or concurrent abatement of multiple types of ACM within a single regulated abatement work area shall not be allowed, unless the multiple types of ACM are part of the same system (e.g. floor tile/cove base and mastics, or ceiling/wall tile and mastic). Simultaneous removals are allowed on a project as long as they are within different regulated abatement work areas. (b) Requirements for Sequential Abatement. When multiple types of abatement work are done in a common regulated abatement work area or enclosure, a sequential order of abatement is required as shown below. (1) Initial Plasticizing. Initial plasticizing of the containment area shall be as required for the most stringent case of removal. (2) Sequential Removal. Sequential removal shall allow for only one type of removal of ACM at a time in a sequential order within the work area until that type of material is completely removed. Thereafter, another type of ACM can be removed within the same work area. Relief from plasticizing is for the surfaces to be abated only at the time of that specific material abatement. Other surfaces shall be plasticized as the material being abated dictate, except as noted below. (i) Order of Sequential Abatement. The following sequence of abatement within a work area shall begin at the ceiling or upper level and progress one material at a time down to the floor and from most friable material to least friable material.

(ii) Example: (a) First. All ceiling fireproofing, ceiling plaster or similar ceiling OSHA Class I friable material shall be completely abated so that no visible exposed ACM, PACM or asbestos material remains. Then the friable mechanical/tank insulation, isolation/ vibration damper material and thermal pipe, ducts, pipe fitting insulation, mudded firebrick, or similar OSHA Class I or Class II friable material shall be completely abated so that no visible exposed material remnants remain. Glovebags may be used. After all friable ACM has been abated, the area shall be cleaned of all debris using HEPA vacuuming and wet wiping. (b) Second. OSHA Class II non-friable materials shall be abated. If other areas were abated, no new plasticization shall be required. Ceiling and wall tiles, transits, interior window glazing, expansion joint, millboard and other NESHAP Category I and II non-friable ACM shall be abated so that no visible exposed material remnants remain and the area shall be cleaned of all debris using HEPA vacuuming and wet wiping. (c) Last. OSHA Class II non-friable flooring abatement shall be

12 NYCRR56 Subparts, Page 80

CITY_21MC100_003234529

NYC-WTC_000448411

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448411Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →