Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
Initial calibration 85-115% of true
Verification: value
immediately after
the initial
calibration curve
Continuing CFs must be within
Calibration: 15% of initial
beginning of each calibration mean
day, every 10 CFs
samples, and at end
of analytical
sequence
Tab/e 13-4a, Summa/v of Ca/ibration Procedures for Fixed Laboratory Ana/yses
Parameter Frequency of Acceptance Corrective Action
Instrument Calibration Criteria
Asbestos TEM Alignment of TEM: NA Perform necessary
performed daily equipment
Magnification: 2x SD must be < 5% maintenance and
monthly__________ cumulative mean check calibration
Camera Constants: 2x SD must be < 5% standards.
monthly__________ cumulative mean
Chrysotile Beam Fibrils must be
Dose: quarterly visible for minimum
of 15 seconds______
Spot Diameter: Variation of spot
quarterly diameters must be
25% of the mean
EDXA Resolution: Mn K peak has
quarterly resolution < 175 eV
at full width half
maximum_________
Plasma Asher: Used to calculate
quarterly time needed to
remove 10$ of
collapsed mixed
cellulose ester filter
101
CITY_21MC100_011979841
NYC-WTC_000448185
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000448185Source: NYC Law Department, mirrored locally