Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 46%

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

NYC-WTC_000447891–000448022
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 62 of 124

• Battery Pack - Rechargeable lithium ion battery pack (or equivalent), fitted with a belt clip, compatible with the personal sampling pump.

• Filters/TEM analysis - Mixed cellulose ester membrane filters, 0.15-um pore size, with a non-conductive cowl, supported by a cassette filter holder, suitable for connection with the personal monitoring pump system.

• Filters/SEM analysis -Polycarbonate filters, 01.jam pore size with 25 mm diameter cassette.

• High Flow Rotometer - 2.0 to 20.0 1pm

10.2.4 Respirable Crystalline Silica and Dust

Respirable dust and crystalline sampling will be performed according to NIOSH Method 0600 - Particulates Not Othemuse Regulated, Respirable following the recommendations for personal sampling. Samples will be collected at a rate of approximately two liters per minute (2 1pm) for a minimum of eight (8) hours for a resulting total air volume of approximately 1.0 m^. To ensure optimum accuracy, the sampling rate will be adjusted, as needed, not to exceed 2 mg dust loading on the filter.

Filters are pre-weighed to a constant weight in the controlled weighing area. If static electricity is evident (e.g., filter not releasing easily from the forceps or it attracts the balance pan), the filter should be passed over an anti-static radiation source. Filters are assembled in the filter cassettes and the cassettes closed firmly by placing a plug at each opening of the cassette to prevent leakage around the filter. For at least 2 hours prior to sampling, the filters are equilibrated in either an environmentally controlled weighing area or chamber.

Pump flow rates of each personal sampling pump, with a representative sampler in line and cyclone grit pot in place, will be measured before and after sample collection. The pump will be run for 10 minutes prior to checking the flow rate. A suitable rotameter (or bubble meter) will be connected to the filter inlet, the flow screw adjusted to the desired sampling value, and the flow rate observed on the rotameter (or bubble meter) will be verified as constant for a minimum of 20 seconds. Flow rates will be recorded on Field Sampling Data Sheets or an equivalent field logbook.

The cyclone’s grit cap is removed prior to use and the interior inspected. If the inside is visibly scored, replace the cyclone because the dust separation characteristics may be altered. Clean the interior of the cyclone to prevent re-entrainment of large particles.

Assemble the sampler head checking for alignment of the filter holder and cyclone in the sampling head to prevent leakage. Care must be taken to prevent the sampler assembly from inverting at any time.

CITY_21MC100_003219898

NYC-WTC_000447953

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447953Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →